Back to bathroom remodel contractors
Damon Knutson
- Based in
- Daly City
- On San Francisco permits
- Jun 2026 to Aug 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2026 | In progress issued Jun 2026 | 171 Peabody St | kitchen remodel like for like including cabinets & countertops. 3x bathroom remodel like for like including new vanity. rear exterior siding replacement to fix dry rot. replace (2) rear windows and rear slider and 2 front; same for same. patch drywall. no floor/structural changes.Details
kitchen remodel like for like including cabinets & countertops. 3x bathroom remodel like for like including new vanity. rear exterior siding replacement to fix dry rot. replace (2) rear windows and rear slider and 2 front; same for same. patch drywall. no floor/structural changes. | $50,000 |