Back to bathroom remodel contractors
Daly Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Aug 2026
- Last 24 months
- 2 permits filed
53 permits since 2000: 47 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 159 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2023 | Never finaled issued Jan 2023, no final | 1263 15th Av | remove all lath & plaster in one and a half bathrooms- also remove tiles, bathub, vanity. insulate walls, ceiling. plumber to install new shower valve, fixtures install new shower pan. install new sheetrock, tape and sand. install new fan and lights.Details
remove all lath & plaster in one and a half bathrooms- also remove tiles, bathub, vanity. insulate walls, ceiling. plumber to install new shower valve, fixtures install new shower pan. install new sheetrock, tape and sand. install new fan and lights. | $15,000 |
| Oct 3, 2014 | Completed final sign-off Mar 2015 | 38 Atalaya Tr | remove old tiles lath, plaster in both bathrooms on 38 & 40. insulate & install new sheetrock & tiles.Details
remove old tiles lath, plaster in both bathrooms on 38 & 40. insulate & install new sheetrock & tiles. | $8,000 |
| Apr 9, 2008 | Completed final sign-off Sep 2008 | 1135 Ulloa St | remove old toilet wash basin, shower tiles and sheetrock on walls and floor. install new bathtub wash basin toilet, new green board & durock and new tiles on walls & floor. install new light over medicine cabinet. also work to be done in bathroom upstairs. no structural work.Details
remove old toilet wash basin, shower tiles and sheetrock on walls and floor. install new bathtub wash basin toilet, new green board & durock and new tiles on walls & floor. install new light over medicine cabinet. also work to be done in bathroom upstairs. no structural work. | $7,500 |
| Dec 10, 2002 | Completed final sign-off Mar 2003 | 306 Parnassus Av | remodel kitchen & 1 bath patch ceilings & wall to address violation 200235220.Details
remodel kitchen & 1 bath patch ceilings & wall to address violation 200235220. | $10,000 |
| Aug 31, 2000 | Expired or cancelled expired Feb 2001 | 2414 Quintara St | remodel bathroom,install new shower, frame around shower,sheetrock ,on ground floorDetails
remodel bathroom,install new shower, frame around shower,sheetrock ,on ground floor | $5,900 |