Back to bathroom remodel contractors
Dailey Construction
- Based in
- San Rafael
- On San Francisco permits
- Jul 2012 to Oct 2012
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2012 | Completed final sign-off Sep 2013 | 1329 29th Av | bathroom remodel. replace all tile, install new tub, replace toilet and install all new plumbing fixtures. add new heat pad for tile floor & no moficiation to any walls.Details
bathroom remodel. replace all tile, install new tub, replace toilet and install all new plumbing fixtures. add new heat pad for tile floor & no moficiation to any walls. | $37,892 |
| Sep 14, 2012 | Completed final sign-off Jan 2013 | 1875 16th Av | revision to 201208147295. enclose 2 doors in bathroom.Details
revision to 201208147295. enclose 2 doors in bathroom. | $2,556 |
| Aug 14, 2012 | Completed final sign-off Jan 2013 | 1875 16th Av | kitchen remodel, replace cabinets, counter tops & flooring w/ new materials. no structural changes or remval on any (e) walls. all electrical & plumbing to satisfy title 24 & local bldg codes. bathroom remodel, replace vanity, shower enclosure, toilet, tub & fixts w/ new materials.Details
kitchen remodel, replace cabinets, counter tops & flooring w/ new materials. no structural changes or remval on any (e) walls. all electrical & plumbing to satisfy title 24 & local bldg codes. bathroom remodel, replace vanity, shower enclosure, toilet, tub & fixts w/ new materials. | $108,982 |