Back to bathroom remodel contractors
D & R Const
- Based in
- So San Francisco
- On San Francisco permits
- Jul 2000 to Aug 2022
- Last 24 months
- 0 permits filed
18 permits since 2000: 17 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2016 | Completed final sign-off May 2016 | 2327 Green St | apt #3 - remodel kitchen: new cabinets, tile, sink, countertops & appliances. remodel bath (1): new tile tub, vanity, countertops, fan & fixtures. remodel bath (2): new tile shower floor, vnity, countertops fan & fixtures. replace sheetrock as needed. no walls to be relocate or removed. n/a maher orDetails
apt #3 - remodel kitchen: new cabinets, tile, sink, countertops & appliances. remodel bath (1): new tile tub, vanity, countertops, fan & fixtures. remodel bath (2): new tile shower floor, vnity, countertops fan & fixtures. replace sheetrock as needed. no walls to be relocate or removed. n/a maher or | $30,000 |
| Jun 11, 2014 | Completed final sign-off Sep 2014 | 1344 Chestnut St | unit # 1344 only: remodel kitchen - new cabinets, appliances, counter tops, patch sheet rock. remodel bathroom - new tile, vanity and tp, new toilet and shower valve, patch sheet rockDetails
unit # 1344 only: remodel kitchen - new cabinets, appliances, counter tops, patch sheet rock. remodel bathroom - new tile, vanity and tp, new toilet and shower valve, patch sheet rock | $18,000 |
| Mar 19, 2014 | Completed final sign-off Apr 2014 | 74 Pixley St | to comply with nov 201458241 remodel bathroom, new sheet rock, tile, 1 windowDetails
to comply with nov 201458241 remodel bathroom, new sheet rock, tile, 1 window | $2,500 |
| Jan 11, 2011 | Completed final sign-off Aug 2011 | 1080 Francisco St | unit #31-renovating/remodeling unit, add skylights (2), new bedroom, remodel 2 bathrooms and one kitchenDetails
unit #31-renovating/remodeling unit, add skylights (2), new bedroom, remodel 2 bathrooms and one kitchen | $25,000 |
| Apr 2, 2007 | Completed final sign-off May 2008 | 776 Union St | move location of kitchen. add interior stairs between basement and 1st floor. add bedroom, bathroom, and laundry room in basement. revise structrural plan to application 200602235240.Details
move location of kitchen. add interior stairs between basement and 1st floor. add bedroom, bathroom, and laundry room in basement. revise structrural plan to application 200602235240. | $30,000 |
| Aug 29, 2003 | Completed final sign-off Nov 2003 | 2455 20th Av | remodel kitchen & bath,sheetrock,tile,new cabinets,counter top,floor & windows,2 bath window,Details
remodel kitchen & bath,sheetrock,tile,new cabinets,counter top,floor & windows,2 bath window, | $20,000 |
| Oct 24, 2001 | Completed final sign-off Mar 2002 | 1344 Chestnut St | remodel kitchen & bath new tile, cabinets, counter repair dryrot in bathrm. install new rep windowsDetails
remodel kitchen & bath new tile, cabinets, counter repair dryrot in bathrm. install new rep windows | $12,000 |
| Jul 6, 2000 | Completed final sign-off Oct 2000 | 438 Lombard St | bathroom remodeling, toilet,vanity tile, kitchen countersDetails
bathroom remodeling, toilet,vanity tile, kitchen counters | $12,500 |