Back to bathroom remodel contractors
D N Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Jun 2026
- Last 24 months
- 8 permits filed
78 permits since 2000: 74 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 32 completed, 1 never finaled. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2026 | Completed final sign-off Aug 2026 | 690 Alvarado St | unit 6: bathroom remodel only, like for like, replace tub for tub, vanity, toilet.Details
unit 6: bathroom remodel only, like for like, replace tub for tub, vanity, toilet. | $20,000 |
| Jan 2, 2026 | Completed final sign-off May 2026 | 572 Waller St | kitchen replace countertops only in kind, bathroom remodel, replace toilet, shower vanity, tub to shower, guest bathroom: replace toilet.Details
kitchen replace countertops only in kind, bathroom remodel, replace toilet, shower vanity, tub to shower, guest bathroom: replace toilet. | $35,000 |
| Apr 28, 2025 | Completed final sign-off Jul 2025 | 255 Red Rock Wy | #h105: bathroom remodel. replace shower, toilet, vanity tiles in kind.Details
#h105: bathroom remodel. replace shower, toilet, vanity tiles in kind. | $16,000 |
| Jun 17, 2024 | Completed final sign-off Dec 2024 | 191 Robinhood Dr | interior remodel to (e) 2-story single family dwelling. remodel (e) 2nd floor bathroom. enlarge opening between kitchen and dining room. new skylight to replace e) per area of work on planDetails
interior remodel to (e) 2-story single family dwelling. remodel (e) 2nd floor bathroom. enlarge opening between kitchen and dining room. new skylight to replace e) per area of work on plan | $15,000 |
| Mar 26, 2024 | Completed final sign-off Jan 2025 | 256 Collingwood St | one kitchen: replace cabinets, counters, tiles, etc. in kind. one bathroom remodel: replace tub, vanity, toilet, tiles, etc. in kind. upper right unit.Details
one kitchen: replace cabinets, counters, tiles, etc. in kind. one bathroom remodel: replace tub, vanity, toilet, tiles, etc. in kind. upper right unit. | $55,000 |
| May 22, 2023 | Completed final sign-off Jun 2023 | 122 Alpine Tr | remodel kichen in kind, remodel 1 bathroom in kind, remodel 1 1/2 bath in kindDetails
remodel kichen in kind, remodel 1 bathroom in kind, remodel 1 1/2 bath in kind | $40,000 |
| Dec 29, 2022 | Completed final sign-off Mar 2023 | 255 Red Rock Wy | unit #h-105: partial bathroom remodel, demo done by restore co. replace tub, toilet, vanity in kind. tile work and paint.Details
unit #h-105: partial bathroom remodel, demo done by restore co. replace tub, toilet, vanity in kind. tile work and paint. | $15,000 |
| Jul 5, 2022 | Completed final sign-off Nov 2022 | 254 Collingwood St | kitchen and replace cabinets, counters, tile, etc. in kind. bathroom: replace tub, vanity, toilet, tiles, etc. in kind bottom left unit.Details
kitchen and replace cabinets, counters, tile, etc. in kind. bathroom: replace tub, vanity, toilet, tiles, etc. in kind bottom left unit. | $55,000 |
| Mar 28, 2022 | Completed final sign-off Apr 2023 | 3133 16th St | unit #10. kitchen: replace all cabinets, appliances, couter tops & tiles in-kind. bathroom: replace shower, vanity, toilet, tiles in kind.Details
unit #10. kitchen: replace all cabinets, appliances, couter tops & tiles in-kind. bathroom: replace shower, vanity, toilet, tiles in kind. | $40,000 |
| Nov 18, 2021 | Completed final sign-off Oct 2022 | 4136 21st St | rev to pa# 202109138336: renovate and reconfigure kitchen layout, remodel and recongigure baths at 1st & 3rd fl. add second bath at 3rd fl. replace rear deck doors at 2nd floor, new door at 1st fl. rearDetails
rev to pa# 202109138336: renovate and reconfigure kitchen layout, remodel and recongigure baths at 1st & 3rd fl. add second bath at 3rd fl. replace rear deck doors at 2nd floor, new door at 1st fl. rear | $80,000 |
| Sep 13, 2021 | Completed final sign-off Oct 2022 | 4136 21st St | interior remodel of 1 kitchen, 1 closet, 2 bathrooms. no alteration of wall, window and door. exterior: remove tiles and membrane from existing rear deck and replace. not visble from street.Details
interior remodel of 1 kitchen, 1 closet, 2 bathrooms. no alteration of wall, window and door. exterior: remove tiles and membrane from existing rear deck and replace. not visble from street. | $15,000 |
| Jul 19, 2021 | Completed final sign-off Oct 2021 | 4027 Irving St | kitchen: replace all cabinets, countertops, tiles, appliances in kind. bathroom: replace tub, vanity, toilet, tiles in kind.Details
kitchen: replace all cabinets, countertops, tiles, appliances in kind. bathroom: replace tub, vanity, toilet, tiles in kind. | $35,000 |
| Jul 19, 2021 | Completed final sign-off Mar 2022 | 3133 16th St | #8: kitchen:replace all cabinets, countertops, tile, appliances in kind. bathroom: replace shower, vanity, toilets, tiles in kind.Details
#8: kitchen:replace all cabinets, countertops, tile, appliances in kind. bathroom: replace shower, vanity, toilets, tiles in kind. | $35,000 |
| Jan 21, 2021 | Completed final sign-off Mar 2021 | 254 Collingwood St | bathroom: replcace tub, toilet, vanity in kind, new tiles. kitchen: replace kitchen cab, new sink in kind, new tiles.paing. building has no fire alarm.Details
bathroom: replcace tub, toilet, vanity in kind, new tiles. kitchen: replace kitchen cab, new sink in kind, new tiles.paing. building has no fire alarm. | $50,000 |
| Jan 8, 2021 | Completed final sign-off Mar 2021 | 75 Ora Wy | bathroom - replace tub + toilet in kind. new tiles. replace vanity top.Details
bathroom - replace tub + toilet in kind. new tiles. replace vanity top. | $16,000 |
| Mar 11, 2020 | Completed final sign-off Jul 2020 | 174 22nd Av | unit 5 - kitchen & bath remodel. new cabinet, counter in kind. new tub, toilet, vanityDetails
unit 5 - kitchen & bath remodel. new cabinet, counter in kind. new tub, toilet, vanity | $30,000 |
| Jan 31, 2020 | Completed final sign-off May 2020 | 110 Broderick St | replace kitchen cabinets and counter in kind. replace vanity toilet, tub/shower in kind. paint & tile work. bathroom 6x8 kitchen 10x10.Details
replace kitchen cabinets and counter in kind. replace vanity toilet, tub/shower in kind. paint & tile work. bathroom 6x8 kitchen 10x10. | $30,000 |
| Mar 25, 2019 | Completed final sign-off Jun 2019 | 260 King St | unit #1611: kitchen - new counters/stone tops only. bath - replace vanity, toilet, tub in kind, new tilesDetails
unit #1611: kitchen - new counters/stone tops only. bath - replace vanity, toilet, tub in kind, new tiles | $9,000 |
| Dec 4, 2018 | Completed final sign-off Jan 2019 | 430 Monterey Bl | bathroom remodle: replace tub, vanity, toilet, sinks in kind.Details
bathroom remodle: replace tub, vanity, toilet, sinks in kind. | $18,000 |
| Nov 9, 2018 | Completed final sign-off Mar 2019 | 690 Alvarado St | bath + kitchen replace tub, vanity, toilet + tiles in kind. kithcen: replace cabinets, sink, appliances + tiles in kind bath 5x8, kithcen 8.5 x 8.5Details
bath + kitchen replace tub, vanity, toilet + tiles in kind. kithcen: replace cabinets, sink, appliances + tiles in kind bath 5x8, kithcen 8.5 x 8.5 | $25,000 |
| Oct 23, 2018 | Completed final sign-off Jul 2019 | 930 Hayes St | units b & c: replace (2) kitchens & (2) bathrooms in-kind, new sheetrockDetails
units b & c: replace (2) kitchens & (2) bathrooms in-kind, new sheetrock | $90,000 |
| Jul 23, 2018 | Completed final sign-off Nov 2018 | 24 Loyola Tr | add second bath within unit at (e) closet and hall areaDetails
add second bath within unit at (e) closet and hall area | $35,000 |
| May 25, 2018 | Completed final sign-off Jul 2018 | 122 Caselli Av | bathroom: replace shower pan in kind. replace wall tiles in shower area. replace floor tilesDetails
bathroom: replace shower pan in kind. replace wall tiles in shower area. replace floor tiles | $4,000 |
| Oct 24, 2017 | Completed final sign-off Dec 2017 | 256 Collingwood St | bathroom replace vanity & toilet in kind , top stays, & tiles on floor & around tub, kitchne replace all cabinets in kind & tiles on floor & backsplash, back exterior replace 280 fq ft of siding, indulation plywood, hardie plank sidingDetails
bathroom replace vanity & toilet in kind , top stays, & tiles on floor & around tub, kitchne replace all cabinets in kind & tiles on floor & backsplash, back exterior replace 280 fq ft of siding, indulation plywood, hardie plank siding | $20,000 |
| May 12, 2017 | Completed final sign-off Jul 2017 | 1305 18th St | apt 1: bathroom: replace tub, toiklet, vainty, tiles in-kind; kitchen: replace cabinets, countertops, tiles, in-kind. no change on walls.Details
apt 1: bathroom: replace tub, toiklet, vainty, tiles in-kind; kitchen: replace cabinets, countertops, tiles, in-kind. no change on walls. | $17,000 |
| Jan 24, 2017 | Completed final sign-off Mar 2017 | 25 Joice St | remodel 2 bathrooms -replace toilet, vanity, tiles, shower pan in kind - bath 1; replace toilet, vanity, tiles in kind - bath tub stay -bath 2Details
remodel 2 bathrooms -replace toilet, vanity, tiles, shower pan in kind - bath 1; replace toilet, vanity, tiles in kind - bath tub stay -bath 2 | $14,000 |
| Apr 12, 2016 | Completed final sign-off Aug 2016 | 690 Alvarado St | bathroom remodel: replace tub, sink, toilets, tiles in kind. unit #4.Details
bathroom remodel: replace tub, sink, toilets, tiles in kind. unit #4. | $9,000 |
| Apr 8, 2016 | Completed final sign-off Oct 2016 | 2857 Mission St | bathroom remodel, replace toilet, vanity, shower, tiles in kind. no walls moved, removed, added or in fill. all existing layouts to remain unchanged.Details
bathroom remodel, replace toilet, vanity, shower, tiles in kind. no walls moved, removed, added or in fill. all existing layouts to remain unchanged. | $9,000 |
| Jan 20, 2016 | Never finaled issued Jan 2016, no final | 2857 Mission St | 2 bathroom remodel: replace lath/plaster with 5/8" gyp board type "x", new sink, new showerpan, new toilet, tiles and new fan and recess lights. replace dryrot wall at bathroom in kind.Details
2 bathroom remodel: replace lath/plaster with 5/8" gyp board type "x", new sink, new showerpan, new toilet, tiles and new fan and recess lights. replace dryrot wall at bathroom in kind. | $1,500 |
| Dec 22, 2015 | Completed final sign-off Mar 2016 | 690 Alvarado St | bath & kitchen: replace tub, sink, toilet, tiles in kind. replace kitchen cabinets, sink, appliances, tiles in kind.Details
bath & kitchen: replace tub, sink, toilet, tiles in kind. replace kitchen cabinets, sink, appliances, tiles in kind. | $17,500 |
| Dec 16, 2014 | Completed final sign-off Feb 2015 | 142 Vienna St | install new kitchen cabinets in kitchen, remove sheetrock from walls in one bedrm half bath,toilet & sink, due to water damage, install insulation,new sheetrock toilet, vanity (1/2 bath downstairs).Details
install new kitchen cabinets in kitchen, remove sheetrock from walls in one bedrm half bath,toilet & sink, due to water damage, install insulation,new sheetrock toilet, vanity (1/2 bath downstairs). | $7,000 |
| Nov 17, 2014 | Completed final sign-off Dec 2014 | 142 Vienna St | bath remodel, replace rotten sub floor, new tub, vanity, toilet, install ceiling fan, new sheetrock & trims, new tiles, no wall moved, removed or added. all fixture layouts and locations to remain unchanged. all (n) lighting shall be high efficacy.Details
bath remodel, replace rotten sub floor, new tub, vanity, toilet, install ceiling fan, new sheetrock & trims, new tiles, no wall moved, removed or added. all fixture layouts and locations to remain unchanged. all (n) lighting shall be high efficacy. | $8,000 |
| Sep 15, 2014 | Completed final sign-off Oct 2014 | 234 Hermann St | replacement of sheetrock, sub floor repair, install new sheetrock, backed board & tiles, replacement of toilet & vanity with new ones, paint, cosmetic bathroom remodel, no doors/windows/walls under this scope.Details
replacement of sheetrock, sub floor repair, install new sheetrock, backed board & tiles, replacement of toilet & vanity with new ones, paint, cosmetic bathroom remodel, no doors/windows/walls under this scope. | $5,000 |