Back to bathroom remodel contractors
D M S Builders
- Based in
- Oakland
- On San Francisco permits
- Jun 2012 to Aug 2016
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 137 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 11, 2016 | Completed final sign-off Feb 2017 | 16 De Long St | comply with complaint 201611116, add 1 bathroom, remodel (e) bathroom & replace interior finishes with 5/8" type "x" gyp board. replace existing siding & windows in-kindDetails
comply with complaint 201611116, add 1 bathroom, remodel (e) bathroom & replace interior finishes with 5/8" type "x" gyp board. replace existing siding & windows in-kind | $30,000 |
| Jun 2, 2015 | Never finaled issued Jun 2015, no final | 1163 Goettingen St | bathroom repair and remodel. replace bathtub faucet, bathtub surrounding, bathroom tile floor, paint bathroom.Details
bathroom repair and remodel. replace bathtub faucet, bathtub surrounding, bathroom tile floor, paint bathroom. | $3,000 |