Back to bathroom remodel contractors
D K Construction
- Based in
- Emerald Hills
- On San Francisco permits
- Dec 2024 to Jun 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 in progress. Typically 173 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2024 | In progress issued Jun 2025 | 3806 Clay St | interior remodel of (e) 3 story include removal & install (e) structural & non-sturctural interior walls. new bathroom on basement. reconfigure kitchen on level 1, 2. new bathroom & new laundry room on level 2. new attic access stair & finished new media room. storage space @ attic.Details
interior remodel of (e) 3 story include removal & install (e) structural & non-sturctural interior walls. new bathroom on basement. reconfigure kitchen on level 1, 2. new bathroom & new laundry room on level 2. new attic access stair & finished new media room. storage space @ attic. | $800,000 |