Back to bathroom remodel contractors
D H D Construction
- Based in
- Hayward
- On San Francisco permits
- Dec 2013 to Aug 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2016 | Completed final sign-off May 2016 | 489 Harrison St | 507: kitchen & 2 bathrooms: replace 8 can lights, intsall 1 can light, replace under cabinets lights, replace 2 bathroom exhaust fans.Details
507: kitchen & 2 bathrooms: replace 8 can lights, intsall 1 can light, replace under cabinets lights, replace 2 bathroom exhaust fans. | $1,000 |
| Nov 30, 2015 | Completed final sign-off Mar 2016 | 355 Buena Vista East Av | one bathroom remodel: replacing tub w/walk in shower, replace toilet, new vanity, sink & faucet. new vinyl flooring & light fixtures. no chnage in openings & layout of walls, high efficacy lighting or controlled by manual-on sensor with high efficacy main light.Details
one bathroom remodel: replacing tub w/walk in shower, replace toilet, new vanity, sink & faucet. new vinyl flooring & light fixtures. no chnage in openings & layout of walls, high efficacy lighting or controlled by manual-on sensor with high efficacy main light. | $8,500 |
| Jul 11, 2014 | Completed final sign-off Jun 2015 | 467 Gates St | kitchen remodel (completed), 1st story bathroom remodel and third floor bathroom remodel. laundry room remodel per inspector. min 50% lighting led, replace new stucco with exiting siding at back.Details
kitchen remodel (completed), 1st story bathroom remodel and third floor bathroom remodel. laundry room remodel per inspector. min 50% lighting led, replace new stucco with exiting siding at back. | $20,000 |
| Dec 23, 2013 | Completed final sign-off Jun 2015 | 467 Gates St | proposed to add two 8'x8' dormers, reframe new stairway, remodel 2 bathrooms @ 2nd & 3rd floor, add one bedroom, entertainment area, legalize (e) full bath on ground floor, upgrade electrical to current code.Details
proposed to add two 8'x8' dormers, reframe new stairway, remodel 2 bathrooms @ 2nd & 3rd floor, add one bedroom, entertainment area, legalize (e) full bath on ground floor, upgrade electrical to current code. | $55,000 |