D. Frederick Brockhurst
- Based in
- San Francisco,
- On San Francisco permits
- Mar 2001 to Dec 2025
- Last 24 months
- 2 permits filed
29 permits since 2000: 17 completed, 2 in progress, 2 never finaled, 8 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2025 | In progress issued Dec 2025 | 200 Divisadero St | revise permit#202507080344 to replace 20% of existing stucco with wood siding, to comply with complaint 202539470, not street facing.Details
revise permit#202507080344 to replace 20% of existing stucco with wood siding, to comply with complaint 202539470, not street facing. | $100 |
| Jul 8, 2025 | In progress issued Jul 2025 | 200 Divisadero St | unit 3: replace siding on rear garage wall. comply with nov 2025-39470.Details
unit 3: replace siding on rear garage wall. comply with nov 2025-39470. | $100 |
| Aug 18, 2016 | Completed final sign-off Jun 2017 | 14 Eureka St | soft story retrofit per sfbc ch 34b; 2012 iebc appendix a-4.Details
soft story retrofit per sfbc ch 34b; 2012 iebc appendix a-4. | $25,000 |
| Aug 18, 2016 | Completed final sign-off Jun 2017 | 14 Eureka St | soft story retrofit per sfbc ch 34b; 2012 iebc appendix a-4. stregthen (e) mezz and ground flr. ref pa 201608185383 for detailsDetails
soft story retrofit per sfbc ch 34b; 2012 iebc appendix a-4. stregthen (e) mezz and ground flr. ref pa 201608185383 for details | $4,000 |
| Jan 29, 2016 | Completed final sign-off Jul 2016 | 160 Sanchez St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher naDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher na | $60,000 |
| Jan 5, 2015 | Expired or cancelled cancelled Aug 2015 | 430 Cortland Av | to comply with physical inspection report cc-7236. fire resistant sheetrock shall be 5/8" type xDetails
to comply with physical inspection report cc-7236. fire resistant sheetrock shall be 5/8" type x | $4,000 |
| Sep 24, 2013 | Completed final sign-off Oct 2013 | 430 Cortland Av | remove partially built storage shed in back yard to coply with nov# 201300851Details
remove partially built storage shed in back yard to coply with nov# 201300851 | $3,500 |
| Jun 21, 2013 | Completed final sign-off Oct 2013 | 91 Stoneyford Av | build a deck at the rear of the buildingDetails
build a deck at the rear of the building | $5,000 |
| Jun 6, 2013 | Completed final sign-off Apr 2014 | 980 Market St | to obtain final inspection for work approved under pa# 200509152982 all work is complete. to comply with nov# 201396341 & 200233957Details
to obtain final inspection for work approved under pa# 200509152982 all work is complete. to comply with nov# 201396341 & 200233957 | |
| Jun 6, 2013 | Completed final sign-off Sep 2014 | 980 Market St | to obtain final inspection for work approved under pa# 200312031523 all work is complete. to comply with nov# 201396341 & 200233957Details
to obtain final inspection for work approved under pa# 200312031523 all work is complete. to comply with nov# 201396341 & 200233957 | |
| May 22, 2013 | Never finaled issued May 2013, no final | 980 Market St | to comply with ces nov #201396341 for final inspection. renew permit #2003-0805-1275. no new work.Details
to comply with ces nov #201396341 for final inspection. renew permit #2003-0805-1275. no new work. | |
| Dec 30, 2011 | Completed final sign-off Nov 2012 | 200 Divisadero St | comply with nov 201058406. repair 15% of existing rear deck and legalize. add inverted simpson strong tie lu526 to 2"x8" deck joists for increased uplift capacity. no change on framing.Details
comply with nov 201058406. repair 15% of existing rear deck and legalize. add inverted simpson strong tie lu526 to 2"x8" deck joists for increased uplift capacity. no change on framing. | $6,500 |
| Oct 28, 2011 | Completed final sign-off Apr 2012 | 85 Grand View Av | kitchen remodel. new cabinet and appliances. update plumbing and electrical at 2nd floor. no structural work. new lighting comply w/cec 150(k).Details
kitchen remodel. new cabinet and appliances. update plumbing and electrical at 2nd floor. no structural work. new lighting comply w/cec 150(k). | $12,000 |
| Apr 13, 2011 | Completed final sign-off May 2011 | 19 Alpine Tr | revision to permit # 201103232645. foundation cap 12" approx 12' pressure treated sill. a bolts 5/8" @ 32" on center. drill @ expoxy # 4 rebar.Details
revision to permit # 201103232645. foundation cap 12" approx 12' pressure treated sill. a bolts 5/8" @ 32" on center. drill @ expoxy # 4 rebar. | $9,000 |
| Jan 28, 2011 | Never finaled issued Jan 2011, no final | 2333 Vallejo St | revision to 201004059623. change plans and permit wording to existing family room. this room was never a bedroom as incorrectly labeled on prior permit. it remains family roomDetails
revision to 201004059623. change plans and permit wording to existing family room. this room was never a bedroom as incorrectly labeled on prior permit. it remains family room | |
| Apr 5, 2010 | Completed final sign-off Mar 2011 | 2333 Vallejo St | add (n) bathroom & closets to (e) space. bathroom will have 1-shower unit, 1-vanity, 1-toilet, 1-gfi outlet, 1-extrator fan & tiled flr. add 1-steam radiator & move 1-steam radiator rm. bedrm. to (n) bathrm. from (e) radiator system. replace 3-elec. wall outlets & install 4-(n) wall outets in bedrm.Details
add (n) bathroom & closets to (e) space. bathroom will have 1-shower unit, 1-vanity, 1-toilet, 1-gfi outlet, 1-extrator fan & tiled flr. add 1-steam radiator & move 1-steam radiator rm. bedrm. to (n) bathrm. from (e) radiator system. replace 3-elec. wall outlets & install 4-(n) wall outets in bedrm. | $17,500 |
| Jan 26, 2009 | Completed final sign-off Mar 2014 | 200 Divisadero St | unit 3 - to obtain final inspection for work approved under pa #200705161443. all work has been complete.Details
unit 3 - to obtain final inspection for work approved under pa #200705161443. all work has been complete. | |
| Jan 26, 2009 | Completed final sign-off May 2009 | 200 Divisadero St | unit 3 - to obtain final inspection for work approved under pa #200705161443. all work has been complete.Details
unit 3 - to obtain final inspection for work approved under pa #200705161443. all work has been complete. | |
| Sep 11, 2007 | Completed final sign-off May 2009 | 200 Divisadero St | #3- foundation work only. weep holes to be added as per revision to appl#200705161443.Details
#3- foundation work only. weep holes to be added as per revision to appl#200705161443. | $4,000 |
| May 16, 2007 | Expired or cancelled expired May 2009 | 200 Divisadero St | repair foundation of garage per drawingsDetails
repair foundation of garage per drawings | $4,000 |
| Apr 3, 2007 | Expired or cancelled expired Oct 2009 | 200 Divisadero St | to complete work for pa# 2005/10/19/6000.Details
to complete work for pa# 2005/10/19/6000. | $15,000 |
| Jul 19, 2006 | Completed final sign-off Jul 2006 | 1825 Turk St | renewal for final inspection 2004/12/01/0398Details
renewal for final inspection 2004/12/01/0398 | |
| Oct 19, 2005 | Expired or cancelled expired Oct 2009 | 200 Divisadero St | demolition of non load bearing walls. build new bathroom. (shower, toilet, vanity). install new tankless water heater & furnace.Details
demolition of non load bearing walls. build new bathroom. (shower, toilet, vanity). install new tankless water heater & furnace. | $40,000 |
| Dec 1, 2004 | Expired or cancelled expired Jun 2008 | 1825 Turk St | #102- remodel bathroom, re-configure layout & install shower where tub isDetails
#102- remodel bathroom, re-configure layout & install shower where tub is | $8,000 |
| Apr 7, 2004 | Completed final sign-off Jun 2004 | 650 Parnassus Av | demolish old kitchen (remove old cabinets, old tile floor) new tile floor update wall outlets, instaDetails
demolish old kitchen (remove old cabinets, old tile floor) new tile floor update wall outlets, insta | $7,500 |
| Oct 20, 2003 | Expired or cancelled withdrawn Dec 2003 | 92 Curtis St | demo of exist deck and stairs. addition of 1 bedroom to back of house and new stairs built.Details
demo of exist deck and stairs. addition of 1 bedroom to back of house and new stairs built. | $24,000 |
| Feb 4, 2003 | Expired or cancelled expired Mar 2004 | 1257 Guerrero St | install 1 steam shower unit in existing closet.Details
install 1 steam shower unit in existing closet. | $4,000 |
| Nov 9, 2001 | Expired or cancelled expired Apr 2002 | 200 Divisadero St | comply w/3r 3410 date 9/21/2001 item h bldg item 9, 10 elec item 16-18 26-30 plb item 36, 44-47Details
comply w/3r 3410 date 9/21/2001 item h bldg item 9, 10 elec item 16-18 26-30 plb item 36, 44-47 | $1,000 |
| Mar 28, 2001 | Completed final sign-off May 2001 | 505 30th St | repair crack in plaster ,new paint, cabinets, replace calvanized pipe with copper & iron pipe .Details
repair crack in plaster ,new paint, cabinets, replace calvanized pipe with copper & iron pipe . | $5,000 |