D Construction A Partnership
- Based in
- San Francisco
- On San Francisco permits
- Jul 2015 to Jan 2017
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2017 | Expired or cancelled cancelled Mar 2017 | 3838 26th St | rear deck repair, like-for-like, less that 50% repair.Details
rear deck repair, like-for-like, less that 50% repair. | $5,000 |
| Jan 25, 2017 | Completed final sign-off Mar 2017 | 814 44th Av | repair kitchen cabinet and change the door. change kitchen window on backyard.Details
repair kitchen cabinet and change the door. change kitchen window on backyard. | $1,300 |
| Jan 24, 2017 | Completed final sign-off Jul 2017 | 3838 26th St | change 2nd floor window and repair stucco. - replace in-kind. visible to the street. windows to be replaced on-kind aluminum to be vinyl. 14 total.Details
change 2nd floor window and repair stucco. - replace in-kind. visible to the street. windows to be replaced on-kind aluminum to be vinyl. 14 total. | $5,000 |
| Jul 26, 2016 | Completed final sign-off Sep 2016 | 1471 Jackson St | unit #10: remodel kitchen and update the electrical sub panel.Details
unit #10: remodel kitchen and update the electrical sub panel. | $10,000 |
| May 19, 2016 | Completed final sign-off Jul 2016 | 2412 Jones St | remodel the kitchen and change 7 windows. update electrical sub panel. u-factor 3.32 max for windows. not visible from street. n/a for maherDetails
remodel the kitchen and change 7 windows. update electrical sub panel. u-factor 3.32 max for windows. not visible from street. n/a for maher | $23,000 |
| Apr 7, 2016 | Never finaled issued Apr 2016, no final | 1521 Howard St | revision 201601136950 - repair (e) rear porch due to dry rot. document "as built" changes. new half bath in second fl. 2 mop sinks to be clothes washersDetails
revision 201601136950 - repair (e) rear porch due to dry rot. document "as built" changes. new half bath in second fl. 2 mop sinks to be clothes washers | $15,000 |
| Jan 13, 2016 | Completed final sign-off Oct 2016 | 1521 Howard St | remodel 2 kitchens, 2 bathrooms. lower units kitchen to be relocated to the dining room. replace 14 windows in kind u = .32. cec 150k no new habitable space.Details
remodel 2 kitchens, 2 bathrooms. lower units kitchen to be relocated to the dining room. replace 14 windows in kind u = .32. cec 150k no new habitable space. | $100,000 |
| Jul 3, 2015 | Completed final sign-off Jul 2016 | 2412 Jones St | add new bedroom and relocate extg kitchen and remodel bathroom at unit #2412a jones st. replace (e) windows not visible from street.Details
add new bedroom and relocate extg kitchen and remodel bathroom at unit #2412a jones st. replace (e) windows not visible from street. | $20,000 |