Back to bathroom remodel contractors
D Cappelletti & Sons Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2019
- Last 24 months
- 0 permits filed
234 permits since 2000: 198 completed, 9 never finaled, 27 expired or cancelled.
Of the 9 never-finaled permits, 1 is 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
43 bathroom remodel permits: 30 completed, 2 never finaled, 11 expired or cancelled. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2019 | Expired or cancelled expired Sep 2024 | 1845 Grant Av | kitchen & bathroom upgrade, no structural, fixtures remain in same place. remove partial drywall.Details
kitchen & bathroom upgrade, no structural, fixtures remain in same place. remove partial drywall. | $38,000 |
| Aug 16, 2018 | Completed final sign-off Sep 2024 | 1845 Grant Av | renovation of (e) 1617 sq ft 3rd fl unit - kitchen, bathroom 1&2, (n) spiral stairs & (n) penthouse at roof, renovation of (e) penthouse, (n) 240 sq ft roof deck.Details
renovation of (e) 1617 sq ft 3rd fl unit - kitchen, bathroom 1&2, (n) spiral stairs & (n) penthouse at roof, renovation of (e) penthouse, (n) 240 sq ft roof deck. | $150,000 |
| Dec 24, 2015 | Never finaled issued Dec 2015, no final | 1457 Masonic Av | remodel 2 bathrooms on 2/f. no structural work or changes.Details
remodel 2 bathrooms on 2/f. no structural work or changes. | $26,000 |
| May 1, 2015 | Completed final sign-off Aug 2015 | 1426 Taylor St | kitchen: replace cabinets & tubs, layout to remain the same, use existing appliances. bathroom: replace vanity & wc, remove tub & install shower. kitchen lighting: min of 50% total wattage in high efficacy. bath lighting: min of 1 high efficacy light. others high efficacy or controlled by vacanDetails
kitchen: replace cabinets & tubs, layout to remain the same, use existing appliances. bathroom: replace vanity & wc, remove tub & install shower. kitchen lighting: min of 50% total wattage in high efficacy. bath lighting: min of 1 high efficacy light. others high efficacy or controlled by vacan | $28,000 |
| Dec 11, 2014 | Completed final sign-off Mar 2015 | 1236 Rhode Island St | master bathroom: remove tile in existing shower, install new tile & valves, replace toilet & vanity; hall bathroom: remkove existing tub & tile, install new valves, install new tile, replace toilet & vanity. no structural workDetails
master bathroom: remove tile in existing shower, install new tile & valves, replace toilet & vanity; hall bathroom: remkove existing tub & tile, install new valves, install new tile, replace toilet & vanity. no structural work | $21,000 |
| Aug 16, 2013 | Completed final sign-off Dec 2013 | 465 Church St | work in apt. #1: remove and replace kitchen cabinets and countertop. remove tiletub and sheetrock in bathroom and replace tub, sheetrock and tile.Details
work in apt. #1: remove and replace kitchen cabinets and countertop. remove tiletub and sheetrock in bathroom and replace tub, sheetrock and tile. | $16,000 |
| Oct 23, 2012 | Completed final sign-off Feb 2013 | 2425 Larkin St | kitchen & bathroom remodel at unit #3: (n)cabinets & countertop in kitchen, (n)bath tub & tiles in bathroom. replace 5 aluminium windows with (n)insulated aluminium windows at rear of bldg, not visible from street. u-factor for windows not to exceed 0.40. no wall relocation.Details
kitchen & bathroom remodel at unit #3: (n)cabinets & countertop in kitchen, (n)bath tub & tiles in bathroom. replace 5 aluminium windows with (n)insulated aluminium windows at rear of bldg, not visible from street. u-factor for windows not to exceed 0.40. no wall relocation. | $45,000 |
| Mar 5, 2012 | Completed final sign-off Aug 2012 | 445 Chestnut St | remodel 2 kitchens new cabinets, appliances and install new fixtures in 3 bathrooms no structural work no wall removal, no new openings, lighting in kitchen & bathrooms shall comply with 2010 cec 150(k)8,10Details
remodel 2 kitchens new cabinets, appliances and install new fixtures in 3 bathrooms no structural work no wall removal, no new openings, lighting in kitchen & bathrooms shall comply with 2010 cec 150(k)8,10 | $48,000 |
| Dec 8, 2011 | Completed final sign-off Feb 2012 | 445 Chestnut St | repair or replace bath tub & floor, repair windows and misc. items as per complaint #201169592 dated 11/10/2011 item #1,2,3,4,6 & 7 only.Details
repair or replace bath tub & floor, repair windows and misc. items as per complaint #201169592 dated 11/10/2011 item #1,2,3,4,6 & 7 only. | $10,000 |
| Jun 10, 2011 | Completed final sign-off Jan 2012 | 2511 Broadway | 2nd floor bathroom: replace fixtures & tile in shower, fixtures remain in same place.Details
2nd floor bathroom: replace fixtures & tile in shower, fixtures remain in same place. | $15,200 |
| May 25, 2011 | Completed final sign-off Sep 2011 | 2342 Jones St | rear bldg - install new kitchen cabinets in kitchen, new shower, toilet and lavy in bathroom.Details
rear bldg - install new kitchen cabinets in kitchen, new shower, toilet and lavy in bathroom. | $16,000 |
| Nov 23, 2010 | Completed final sign-off Feb 2012 | 95 Crestlake Dr | remodel kitchen & 3 bathrooms, add new side entrance (exterior).Details
remodel kitchen & 3 bathrooms, add new side entrance (exterior). | $30,000 |
| Oct 16, 2009 | Completed final sign-off Feb 2010 | 455 Church St | replace cabinets and countertop in 2 kitchen s. replace bath tubs and tile surround on walls in 2 bathrooms. no structural workDetails
replace cabinets and countertop in 2 kitchen s. replace bath tubs and tile surround on walls in 2 bathrooms. no structural work | $28,000 |
| Jul 31, 2009 | Completed final sign-off Nov 2009 | 365 Guerrero St | replace 8 lin ft of sink and countertop in kitchen. replace tub, toilet, and sink, tile in bath. no structura work. all work unit 4Details
replace 8 lin ft of sink and countertop in kitchen. replace tub, toilet, and sink, tile in bath. no structura work. all work unit 4 | $12,500 |
| Apr 1, 2009 | Completed final sign-off Jul 2009 | 2834 Pierce St | patch holes in garage ceiling, install handrail at side stairway kitchen cabinets, provide proper clearance for toilet in 1/2 bath. comply with physical inspection report#cc-5455.Details
patch holes in garage ceiling, install handrail at side stairway kitchen cabinets, provide proper clearance for toilet in 1/2 bath. comply with physical inspection report#cc-5455. | $8,800 |
| Mar 27, 2009 | Completed final sign-off Jul 2009 | 465 Church St | replace cabinets and counter top in 1 kitchen. install new tile and fixtures in 1 bathroom. no new lighting.Details
replace cabinets and counter top in 1 kitchen. install new tile and fixtures in 1 bathroom. no new lighting. | $18,000 |
| Mar 6, 2009 | Completed final sign-off Jun 2009 | 490 Lombard St | apt. #2: replace toilet, tub, lavy in bathroom. replace cabinets, tops and floor in kitchen. no structural work no change in opening or walls. (one kitchen and one bathroom remodeling)Details
apt. #2: replace toilet, tub, lavy in bathroom. replace cabinets, tops and floor in kitchen. no structural work no change in opening or walls. (one kitchen and one bathroom remodeling) | $16,000 |
| Jan 15, 2009 | Completed final sign-off Nov 2009 | 1655 Beach St | widening of garage door and rear balcony addition, replacment windows and siding at sides and rear, new doors at rear, 3 new skylights , 2 new parapets at roof, remodel gr floor with new full bath, remodel 3rd fl, kitchen and 2 baths, voluntary reinforcing of roof framing for future roof deck.Details
widening of garage door and rear balcony addition, replacment windows and siding at sides and rear, new doors at rear, 3 new skylights , 2 new parapets at roof, remodel gr floor with new full bath, remodel 3rd fl, kitchen and 2 baths, voluntary reinforcing of roof framing for future roof deck. | $125,000 |
| Dec 31, 2008 | Completed final sign-off Nov 2009 | 1655 Beach St | work @ unit# 1655 only. install new fixtures in existing 2 bathrooms. rough-in remains the same. new tile at shoers. no structural work.Details
work @ unit# 1655 only. install new fixtures in existing 2 bathrooms. rough-in remains the same. new tile at shoers. no structural work. | $25,000 |
| Dec 5, 2008 | Completed final sign-off Jul 2009 | 465 Church St | work @ unit#2. replace 12 ft of cabinets and counter top in kitchen. install new tile and fixture in bathroom.Details
work @ unit#2. replace 12 ft of cabinets and counter top in kitchen. install new tile and fixture in bathroom. | $15,000 |
| Oct 9, 2008 | Completed final sign-off Mar 2009 | 455 Church St | work @ apt#1 & #3.repalce cabinets, & counter tops in 2 kitchens, replace tile and fixtures in 2 bathrooms . no structural work. no new lighting.Details
work @ apt#1 & #3.repalce cabinets, & counter tops in 2 kitchens, replace tile and fixtures in 2 bathrooms . no structural work. no new lighting. | $28,000 |
| Jan 17, 2008 | Completed final sign-off Sep 2008 | 2950 Divisadero St | change fixtures in master bath-same location, no structural. new lighting to be high efficacy or manual on auto off switch.Details
change fixtures in master bath-same location, no structural. new lighting to be high efficacy or manual on auto off switch. | $10,500 |
| Jan 4, 2008 | Completed final sign-off Jul 2008 | 476 Lombard St | remodel kitchen and bathroom. no structural work. 50% high efficacy in kitchen lighting min. bath high efficacy or manual on auto off switch.Details
remodel kitchen and bathroom. no structural work. 50% high efficacy in kitchen lighting min. bath high efficacy or manual on auto off switch. | $23,000 |
| Nov 20, 2007 | Never finaled issued Nov 2007, no final | 529 Arkansas St | remodel 1 kitchen & 1 bathroom. new fixture & cabinets. no structural work. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor.Details
remodel 1 kitchen & 1 bathroom. new fixture & cabinets. no structural work. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor. | $30,000 |
| Nov 13, 2007 | Expired or cancelled expired Aug 2008 | 365 Guerrero St | replace cabinets and tops in 2 kitchens. apt 2 & 3. no appliances, no fixtures. replace plumbing fixtures in 3 bathrooms apt 1,2,3. no structural work. no lighting.Details
replace cabinets and tops in 2 kitchens. apt 2 & 3. no appliances, no fixtures. replace plumbing fixtures in 3 bathrooms apt 1,2,3. no structural work. no lighting. | $9,600 |
| Apr 24, 2007 | Completed final sign-off Aug 2007 | 577 Oak Park Dr | install new tile in existing shower and floor master bathroom. install mew bath tub and tile in 2nd bathroom.use existing toilets no structural work. work in 2 bathrooms no structural provide flourescent lights or occupancy sensor in bathroom.Details
install new tile in existing shower and floor master bathroom. install mew bath tub and tile in 2nd bathroom.use existing toilets no structural work. work in 2 bathrooms no structural provide flourescent lights or occupancy sensor in bathroom. | $22,400 |
| Mar 19, 2007 | Expired or cancelled expired Sep 2008 | 2298 16th Av | remodel kitchen + master bath. no structural work.Details
remodel kitchen + master bath. no structural work. | $28,500 |
| Sep 20, 2006 | Expired or cancelled expired May 2007 | 800 York St | remodel kitchen + bathroom flourescent lighting.Details
remodel kitchen + bathroom flourescent lighting. | $22,500 |
| Jul 18, 2006 | Expired or cancelled expired May 2007 | 804 York St | remodel kitchen & bathroom. no structural work.Details
remodel kitchen & bathroom. no structural work. | $22,500 |
| Jul 18, 2006 | Expired or cancelled expired May 2007 | 802 York St | remodel kitchen & bathroom. no structural work.Details
remodel kitchen & bathroom. no structural work. | $22,500 |
| Dec 14, 2005 | Expired or cancelled expired Aug 2006 | 195 Alhambra St | replace kitchen cabinets, counter tops, replace tub in master bath. no structural work.Details
replace kitchen cabinets, counter tops, replace tub in master bath. no structural work. | $18,500 |
| Nov 22, 2005 | Completed final sign-off Aug 2006 | 2643 18th Av | remodel 1 master bath, no structural work, n sink, fixtures, tub, shower, tile, misc elec plumbingDetails
remodel 1 master bath, no structural work, n sink, fixtures, tub, shower, tile, misc elec plumbing | $23,000 |
| Sep 27, 2005 | Expired or cancelled expired Oct 2006 | 727 Marina Bl | remodel (e) 2 bathrooms on 3/f,4/f.no structural workDetails
remodel (e) 2 bathrooms on 3/f,4/f.no structural work | $21,000 |
| Mar 11, 2005 | Completed final sign-off Jul 2006 | 50 San Leandro Wy | remodel 2 bathrooms- new fixtures in same location.tile.no structural changes. 2nd floor bathrooms.Details
remodel 2 bathrooms- new fixtures in same location.tile.no structural changes. 2nd floor bathrooms. | $39,600 |
| Mar 1, 2005 | Completed final sign-off Oct 2005 | 808 York St | remodel kitchen & bath.no structural work. kitchen:replace cabinet,flooring,sink,appliances,counterDetails
remodel kitchen & bath.no structural work. kitchen:replace cabinet,flooring,sink,appliances,counter | $21,000 |
| Mar 1, 2005 | Completed final sign-off Oct 2005 | 806 York St | remodel kitchen & bath.no structural work. kitchen:replace cabinet,flooring,sink,appliances,counterDetails
remodel kitchen & bath.no structural work. kitchen:replace cabinet,flooring,sink,appliances,counter | $21,000 |
| Jul 11, 2003 | Completed final sign-off Jul 2003 | 2297 Laguna St | revision to permit 200204053276 to not remodel existing bathroomDetails
revision to permit 200204053276 to not remodel existing bathroom | |
| Oct 24, 2002 | Completed final sign-off Feb 2003 | 3421 Jackson St | bathroom remodelDetails
bathroom remodel | $8,600 |
| Apr 5, 2002 | Completed final sign-off Jul 2003 | 2297 Laguna St | unit 5 only.horizontal addition on grd fl-elevator hallway, on 2nd fl-sitting room.remodel bathroom.Details
unit 5 only.horizontal addition on grd fl-elevator hallway, on 2nd fl-sitting room.remodel bathroom. | $30,000 |
| Aug 21, 2001 | Expired or cancelled expired Sep 2002 | 3632 Lyon St | repair fire damage to master bedroom, closet and two bathrooms, (no structural work)Details
repair fire damage to master bedroom, closet and two bathrooms, (no structural work) | $38,500 |
| Aug 21, 2001 | Expired or cancelled expired Feb 2002 | 167 Knockash Hl | change plumbing fixures in lower bathroom & powder room, remove tub and install shower in bathroom oDetails
change plumbing fixures in lower bathroom & powder room, remove tub and install shower in bathroom o | $15,500 |
| May 31, 2001 | Completed final sign-off Jan 2002 | 810 York St | remodel kitchen & bath non-structuralDetails
remodel kitchen & bath non-structural | $13,650 |
| Jan 6, 2000 | Expired or cancelled expired Oct 2000 | 429 Buena Vista East Av | replace existing window at rear,repair existing enterior stairs,railing,fixture in bathDetails
replace existing window at rear,repair existing enterior stairs,railing,fixture in bath |