Back to bathroom remodel contractors
Cw Cheng Construction Co
- Based in
- Pacifica
- On San Francisco permits
- Aug 2007 to Jan 2024
- Last 24 months
- 0 permits filed
21 permits since 2000: 16 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 5 days from filing to permit and 478 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2022 | Completed final sign-off Dec 2024 | 2782 Folsom St | unit's: 2,5,& 6. kitchen and bath remodel. no plumbing layout/ fixture change. no layout chage, replace gyp board and window in kind. street facingDetails
unit's: 2,5,& 6. kitchen and bath remodel. no plumbing layout/ fixture change. no layout chage, replace gyp board and window in kind. street facing | $60,000 |
| May 24, 2022 | Completed final sign-off Sep 2022 | 638 21st Av | to comply with complaint 202290925 and 202290733. 2nd fl - remodel kitchen & bathroom; ground fl - add 1 full bath, 1 office 2 storage roomsDetails
to comply with complaint 202290925 and 202290733. 2nd fl - remodel kitchen & bathroom; ground fl - add 1 full bath, 1 office 2 storage rooms | $65,000 |
| Sep 14, 2021 | Completed final sign-off Aug 2023 | 765 05th Av | front bldg: remodel. 1st/f enlarge parking spaces & remove bath and storage. remove rear facade window and replace siding. 2nd/f and 3rd/f replace in-kind rear windows. replae in-kind (e) grage door.Details
front bldg: remodel. 1st/f enlarge parking spaces & remove bath and storage. remove rear facade window and replace siding. 2nd/f and 3rd/f replace in-kind rear windows. replae in-kind (e) grage door. | $50,000 |
| Jul 1, 2021 | Completed final sign-off Feb 2023 | 1670 Funston Av | kitchen remodel with wall removal. bathroom addition. no change to exterior building envelope.Details
kitchen remodel with wall removal. bathroom addition. no change to exterior building envelope. | $20,000 |
| Jun 16, 2021 | Completed final sign-off Nov 2022 | 148 Huntington Dr | convert e 1st fl garage area to living rm, 1 bdrm, 1 bath, 1 powder room. 2nd fl remodel kitchen and add 1 bath, remove fireplace and add 4 skylights.Details
convert e 1st fl garage area to living rm, 1 bdrm, 1 bath, 1 powder room. 2nd fl remodel kitchen and add 1 bath, remove fireplace and add 4 skylights. | $120,000 |
| Jun 14, 2021 | Completed final sign-off Nov 2022 | 148 Huntington Dr | bathroom remodel, no plumbing change. no structural work and no framing modificationDetails
bathroom remodel, no plumbing change. no structural work and no framing modification | $10,000 |
| Jun 29, 2020 | Completed final sign-off Dec 2020 | 315 San Leandro Wy | remodel 6'x7 bathroom,retile shower & floor,replace shower enclosure & vanity countertop, repaint bathroom.all remodel work in-kind. all this work is not on the ground floor.Details
remodel 6'x7 bathroom,retile shower & floor,replace shower enclosure & vanity countertop, repaint bathroom.all remodel work in-kind. all this work is not on the ground floor. | $12,000 |
| Nov 12, 2019 | Completed final sign-off Mar 2020 | 1223 24th Av | new hallway, bathroom located on 1st fl.Details
new hallway, bathroom located on 1st fl. | $42,860 |