Back to bathroom remodel contractors
Cutler Construction
- Based in
- Woodacre
- On San Francisco permits
- Jul 2009 to Oct 2016
- Last 24 months
- 0 permits filed
28 permits since 2000: 22 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 1 never finaled, 2 expired or cancelled. Typically 10 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2016 | Never finaled issued Jun 2016, no final | 743 Elizabeth St | top left unit & bottomn left unit - kithcen & bathroom facelit - replace cabinets, countertops, fixtures.Details
top left unit & bottomn left unit - kithcen & bathroom facelit - replace cabinets, countertops, fixtures. | $15,000 |
| Sep 15, 2014 | Completed final sign-off Mar 2015 | 616 44th Av | renovation of existing bath at 2nd flDetails
renovation of existing bath at 2nd fl | $15,000 |
| Aug 14, 2014 | Expired or cancelled expired Feb 2017 | 32 Aztec St | new office, bathroom & storage on ground floor, new radiant heating throughout. lower floor slab. (n) insulation at new window - wood.Details
new office, bathroom & storage on ground floor, new radiant heating throughout. lower floor slab. (n) insulation at new window - wood. | $80,000 |
| Jul 7, 2014 | Completed final sign-off Jul 2015 | 3471 21st St | unit 5: in-kind bathroom renovation, new flooring, electrical & lighting upgrades, blow-in insulating & sheetrock, patching & sound proofing throughout.Details
unit 5: in-kind bathroom renovation, new flooring, electrical & lighting upgrades, blow-in insulating & sheetrock, patching & sound proofing throughout. | $15,000 |
| Apr 8, 2014 | Completed final sign-off Dec 2014 | 761 34th Av | renovation of kitchen & 2 baths, reconfigure three bedroom areas, open wall area between dining & kitchen areas, replace interior finishes a srequired, add laundry, all within unit #761, replace windows in kind.Details
renovation of kitchen & 2 baths, reconfigure three bedroom areas, open wall area between dining & kitchen areas, replace interior finishes a srequired, add laundry, all within unit #761, replace windows in kind. | $35,000 |
| Mar 25, 2014 | Completed final sign-off Oct 2014 | 649 Moultrie St | basement renovation: new bathroom and addition of (1) new bedroom. new stair connecting main floor to finished basementDetails
basement renovation: new bathroom and addition of (1) new bedroom. new stair connecting main floor to finished basement | $60,000 |
| Oct 29, 2013 | Expired or cancelled cancelled May 2014 | 761 34th Av | remodel of existing kitchen and 2-bathrooms in kind at lower unit above garage.no change in exhaust ducts. no extg walls to be altered, moved or removed.no structural work. no wall removal or alteration.Details
remodel of existing kitchen and 2-bathrooms in kind at lower unit above garage.no change in exhaust ducts. no extg walls to be altered, moved or removed.no structural work. no wall removal or alteration. | $36,000 |
| Aug 16, 2013 | Completed final sign-off Feb 2015 | 20 Aztec St | add new master bedroom, bath and closet to existing ground floor. excavate to achieve required headroom (g.g. 8/19/2013)Details
add new master bedroom, bath and closet to existing ground floor. excavate to achieve required headroom (g.g. 8/19/2013) | $100,000 |
| Dec 3, 2010 | Completed final sign-off Mar 2011 | 1350 Washington St | unt # 21: apartment remodel - kitchen and bathroom; all in kind w/ high efficient lights.Details
unt # 21: apartment remodel - kitchen and bathroom; all in kind w/ high efficient lights. | $10,000 |
| Sep 3, 2010 | Completed final sign-off Feb 2011 | 1350 Washington St | unit #33: kitchen/bathroom remodel to comply with violation notice 201065046 (in kind replacement only), provide high efficiency lights or t-24 per cec150(k)Details
unit #33: kitchen/bathroom remodel to comply with violation notice 201065046 (in kind replacement only), provide high efficiency lights or t-24 per cec150(k) | $10,000 |
| Dec 1, 2009 | Completed final sign-off May 2010 | 2318 22nd St | replace laundry (washer) hoses, replace broken hose bib. replace bathroom sink fixtures. main electrical panel upgrade. dry wall patch & paint. approx. 30 sqf.Details
replace laundry (washer) hoses, replace broken hose bib. replace bathroom sink fixtures. main electrical panel upgrade. dry wall patch & paint. approx. 30 sqf. | $4,500 |
| Jul 21, 2009 | Completed final sign-off Aug 2009 | 969 De Haro St | twi batgs renidek & laundry relocation. 2nd floor bath - replace tub, sink, toilet, tile in-kind (face lift). 1st floor bath - move sink location, convert tub/shower to shower only, relocate laundry to hallway, replace tile.Details
twi batgs renidek & laundry relocation. 2nd floor bath - replace tub, sink, toilet, tile in-kind (face lift). 1st floor bath - move sink location, convert tub/shower to shower only, relocate laundry to hallway, replace tile. | $16,000 |