Back to bathroom remodel contractors
Custom Home Builders
- Based in
- Half Moon Bay
- On San Francisco permits
- Jul 2016 to Sep 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 4 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2016 | Completed final sign-off Feb 2017 | 1442 10th Av | main floor kit remodel: renovations and minor alt. new cabinets no structural. frame new 5'-0" x 6'-8" swing out. new appliances french door, removal of non working wood buring fire place removal of non bearing partition to enhance kit space. create half bath & laundry space.Details
main floor kit remodel: renovations and minor alt. new cabinets no structural. frame new 5'-0" x 6'-8" swing out. new appliances french door, removal of non working wood buring fire place removal of non bearing partition to enhance kit space. create half bath & laundry space. | $65,000 |
| Jul 1, 2016 | Completed final sign-off Nov 2016 | 1442 10th Av | 2/f: remodel/renovation hallway bathroom, no structural work required. replace fixtures alike per alike. fixtures will be replace at same area as originals.Details
2/f: remodel/renovation hallway bathroom, no structural work required. replace fixtures alike per alike. fixtures will be replace at same area as originals. | $25,000 |