Back to bathroom remodel contractors
Custom Carpentry
- Based in
- Oakland
- On San Francisco permits
- Jun 2014 to Jun 2015
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 62 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 19, 2015 | Never finaled issued Jun 2015, no final | 262 02nd Av | unit 1405 - kitchen insall 4 recessed lights; bedroom replace electrci heater; bath - replace shower pan, shower valve, wall tile, floor tile, install recessed light in shower area, replace vanity top. no structural workDetails
unit 1405 - kitchen insall 4 recessed lights; bedroom replace electrci heater; bath - replace shower pan, shower valve, wall tile, floor tile, install recessed light in shower area, replace vanity top. no structural work | $10,100 |
| Apr 29, 2015 | Completed final sign-off Jun 2015 | 1424 Chestnut St | (n) e fan at bathroom, move toilet & flange, bath sint water supply & drain, move shower drain. change both entry door, install recessed bath lights, move vanity outlet, install new shower pan, install faloor & wall tile, install water & drain for laundry install electrical for laundry. installDetails
(n) e fan at bathroom, move toilet & flange, bath sint water supply & drain, move shower drain. change both entry door, install recessed bath lights, move vanity outlet, install new shower pan, install faloor & wall tile, install water & drain for laundry install electrical for laundry. install | $5,000 |
| Dec 16, 2014 | Completed final sign-off Feb 2015 | 1662 44th Av | remodel bathroom includes tile floor & walls.Details
remodel bathroom includes tile floor & walls. | $15,000 |