Back to bathroom remodel contractors
Current Construction Co.
- Based in
- San Lorenzo
- On San Francisco permits
- Nov 2001 to Jul 2017
- Last 24 months
- 0 permits filed
17 permits since 2000: 10 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2017 | Completed final sign-off Apr 2018 | 2625 35th Av | remodel (e) bath in 1st fl. to add a shower stallDetails
remodel (e) bath in 1st fl. to add a shower stall | $3,000 |
| Dec 10, 2013 | Completed final sign-off Sep 2014 | 1975 41st Av | remodel existing kitchn/bath. replace kitchen cabinets, countertops, faucet, vanity, bathroom toilet, shower with new update electrical to code. add fan to bath, new lighting. replace existing electrical service panel with new. environmental air ducts 3' from pl and openings.lighting led/flrcntDetails
remodel existing kitchn/bath. replace kitchen cabinets, countertops, faucet, vanity, bathroom toilet, shower with new update electrical to code. add fan to bath, new lighting. replace existing electrical service panel with new. environmental air ducts 3' from pl and openings.lighting led/flrcnt | $18,276 |
| Aug 14, 2009 | Never finaled issued Aug 2009, no final | 2334 Fulton St | removing non-bearing walls to build new bathroom out of two existing closets. (units #2334 & #2336) to comply w/nov dated 8/17/07 comp. #200717930.Details
removing non-bearing walls to build new bathroom out of two existing closets. (units #2334 & #2336) to comply w/nov dated 8/17/07 comp. #200717930. | $18,000 |
| Aug 5, 2009 | Never finaled issued Aug 2009, no final | 2334 Fulton St | to comply with his nov 200717930 dated 8/17/07 remodel ktichen & bathroom in two units (unit #2334 & #2336) like for like. provide high efficacy lighting per title-24.Details
to comply with his nov 200717930 dated 8/17/07 remodel ktichen & bathroom in two units (unit #2334 & #2336) like for like. provide high efficacy lighting per title-24. | $30,000 |
| Sep 9, 2008 | Expired or cancelled expired Oct 2011 | 2506 36th Av | vertical addition - add 3rd floor with an exercise room, master suite, a bedroom, & a full bath. in 2nd floor - change one existing bedroom to den. in 1st floor - add a family room & a full bath for single family use only.Details
vertical addition - add 3rd floor with an exercise room, master suite, a bedroom, & a full bath. in 2nd floor - change one existing bedroom to den. in 1st floor - add a family room & a full bath for single family use only. | $120,000 |
| Nov 28, 2001 | Completed final sign-off Jan 2002 | 195 Arleta Av | abate nov 200122659, replace kitchen cabinet/countertop/sink/faucet/disposal/tile floor/bath-tub/floDetails
abate nov 200122659, replace kitchen cabinet/countertop/sink/faucet/disposal/tile floor/bath-tub/flo | $8,000 |