Curbio Inc
- Based in
- Potomac
- On San Francisco permits
- Feb 2021 to Dec 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2023 | Completed final sign-off Apr 2024 | 34 Roselyn Tr | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $28,000 |
| Jan 4, 2023 | Completed final sign-off Jul 2023 | 239 Monticello St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment. | $55,000 |
| Jan 4, 2023 | Expired or cancelled cancelled Feb 2023 | 1366 35th Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $28,000 |
| Jan 3, 2023 | Completed final sign-off Jul 2023 | 579 Flood Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $40,750 |
| Jul 12, 2022 | Completed final sign-off Oct 2022 | 1200 Rhode Island St | unit 3: interior renovation to include remodel of bathroom, new kitchen , quartz countertops w/ 4" backsplash and sink.Details
unit 3: interior renovation to include remodel of bathroom, new kitchen , quartz countertops w/ 4" backsplash and sink. | $18,000 |
| Feb 7, 2022 | Completed final sign-off Apr 2022 | 473 Tehama St | demo wall at kitchen entry. infill new wall with structural support.Details
demo wall at kitchen entry. infill new wall with structural support. | $18,000 |
| Dec 15, 2021 | Completed final sign-off Apr 2022 | 516 Ramsell St | remove non beariing walls in kitchen.Details
remove non beariing walls in kitchen. | $23,679 |
| Oct 25, 2021 | Completed final sign-off Mar 2022 | 145 Miraloma Dr | remove non load bearing shower walls in master bathroom. remove and dispose of 2 garden windows in dining and kitchen, replace with fixed glass window with aluminum frame. windows not street visible. also include kitchen remodel and 2 bathrooms remodels.Details
remove non load bearing shower walls in master bathroom. remove and dispose of 2 garden windows in dining and kitchen, replace with fixed glass window with aluminum frame. windows not street visible. also include kitchen remodel and 2 bathrooms remodels. | $6,250 |
| Oct 21, 2021 | Expired or cancelled cancelled Oct 2021 | 145 Miraloma Dr | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). alteration of service equipment. | $47,709 |
| May 18, 2021 | Completed final sign-off Dec 2021 | 2930 Van Ness Av | interior remodel: new shower in (e) bath at 3ed fl. replace finishes in bath at 2nd fl. replace a tub w/ a shower at 1st fl bath. remove a load-bearing partition & infill (e) door in kitchen.Details
interior remodel: new shower in (e) bath at 3ed fl. replace finishes in bath at 2nd fl. replace a tub w/ a shower at 1st fl bath. remove a load-bearing partition & infill (e) door in kitchen. | $72,000 |
| Apr 7, 2021 | Completed final sign-off Oct 2021 | 2554 44th Av | remove & replace (e) electrical main service panel. remove & replace (e) kitchen, update circuits w/ afci gfci. remove & replace (e) bathroom update circuits w/ afci/gfci. sheetrock over existing ceilings.Details
remove & replace (e) electrical main service panel. remove & replace (e) kitchen, update circuits w/ afci gfci. remove & replace (e) bathroom update circuits w/ afci/gfci. sheetrock over existing ceilings. | $60,000 |
| Feb 10, 2021 | Completed final sign-off Dec 2021 | 383 21st Av | replace in-kind kitchen, ful bathroom &half bathroom. no walls moving.Details
replace in-kind kitchen, ful bathroom &half bathroom. no walls moving. | $50,000 |