Back to bathroom remodel contractors
Cunningham Electric And Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Oct 2007 to Jul 2020
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 28 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2020 | Completed final sign-off May 2021 | 1509 Noriega St | 1509 remodel bathroom, rewire all upgrade new elec. services, new water htr. remodel kitchen partial, new heating system drywall insulate garage ceiling, change bath window. 1511: remodel bathroom, rewire all upgrade, new elec service, brace water htr, remodel kitchen, new heating system.Details
1509 remodel bathroom, rewire all upgrade new elec. services, new water htr. remodel kitchen partial, new heating system drywall insulate garage ceiling, change bath window. 1511: remodel bathroom, rewire all upgrade, new elec service, brace water htr, remodel kitchen, new heating system. | $95,000 |
| Dec 5, 2007 | Completed final sign-off Mar 2008 | 587 Post St | renovation of existing retail space demo non structual partions new bathrooms finishes. minor non-structural demolitionm, new drywall partitions, new accessible toilet and dressing room, finishes. electrical, hvac and plumbing on seperate permit.Details
renovation of existing retail space demo non structual partions new bathrooms finishes. minor non-structural demolitionm, new drywall partitions, new accessible toilet and dressing room, finishes. electrical, hvac and plumbing on seperate permit. | $87,500 |