Back to bathroom remodel contractors
Cruz Construction
- Based in
- Oakley
- On San Francisco permits
- Jul 2001 to Dec 2017
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2007 | Never finaled issued Feb 2007, no final | 2911 Jackson St | bathroom remodel to include replacement of console vanity lav with new console vanity lav, replacement of toilet w/ low flow toilet., replacement of clawfoot tub with new tub and tile surround w. glass door, new floor tile, new dry wall to replace lathe and plaster, new trim around (e) door & windowDetails
bathroom remodel to include replacement of console vanity lav with new console vanity lav, replacement of toilet w/ low flow toilet., replacement of clawfoot tub with new tub and tile surround w. glass door, new floor tile, new dry wall to replace lathe and plaster, new trim around (e) door & window | $20,000 |
| Jun 10, 2004 | Never finaled issued Jun 2004, no final | 85 Ora Wy | replace kitchen cabinets bath room vanity and toilet replace tiles and counter top work done in unitDetails
replace kitchen cabinets bath room vanity and toilet replace tiles and counter top work done in unit | $8,000 |