Back to kitchen remodel contractors
Crown Construction San Francisco
- Based in
- San Francisco
- On San Francisco permits
- Aug 2011 to Oct 2026
- Last 24 months
- 12 permits filed
67 permits since 2000: 48 completed, 10 in progress, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 9 completed, 6 in progress, 1 expired or cancelled. Typically 2 days from filing to permit and 555 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jul 2026 | 143 Buena Vista East Av | electrical rewire, interior remodel to include bathroom and kitchen remodel, replace (e) staircase and remove and infill secondary staircaseDetails
electrical rewire, interior remodel to include bathroom and kitchen remodel, replace (e) staircase and remove and infill secondary staircase | $275,000 |
| May 14, 2026 | In progress issued Sep 2026 | 20 Graystone Tr | new mat slab foundation with new conditioned space at 1st floor,including new area under 2nd floor kitchen footprint; new exterior stairs;infill 2 levels of existing lightwell; limited interior remodel.Details
new mat slab foundation with new conditioned space at 1st floor,including new area under 2nd floor kitchen footprint; new exterior stairs;infill 2 levels of existing lightwell; limited interior remodel. | $850,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 143 Buena Vista East Av | interior remodel in-kind of kitchen and bathrooms; no structural work.Details
interior remodel in-kind of kitchen and bathrooms; no structural work. | $20,000 |
| Nov 18, 2025 | In progress issued Feb 2026 | 2870 California St | ref to permits 202506138726, 202311060288. interior revisions (reduce scope). remove non-bearing wall on gl3.1 and 3.3. remove (1) kitchenette. remove restroom #106, remove door# 103c. reconfigure restroom #104.Details
ref to permits 202506138726, 202311060288. interior revisions (reduce scope). remove non-bearing wall on gl3.1 and 3.3. remove (1) kitchenette. remove restroom #106, remove door# 103c. reconfigure restroom #104. | |
| Oct 23, 2025 | In progress issued Oct 2025 | 2200 Sacramento St | unit 1402: remodel kitchen, replace cabinets, counter tops, and flooring. (2) bathroom remodel tiles for shower, plumbing, vanitites, recessed cans, like for like.Details
unit 1402: remodel kitchen, replace cabinets, counter tops, and flooring. (2) bathroom remodel tiles for shower, plumbing, vanitites, recessed cans, like for like. | $150,000 |
| May 1, 2024 | Completed final sign-off Jun 2026 | 2200 Sacramento St | unit #1503: kitchen + bathroom remodel, replace kitchen cabinets & countertops, fixtures, bathroom tile + fixtures.Details
unit #1503: kitchen + bathroom remodel, replace kitchen cabinets & countertops, fixtures, bathroom tile + fixtures. | $200,000 |
| Nov 6, 2023 | In progress issued Mar 2025 | 2870 California St | voluntary structural improvement @ 1st & basement levels.(n) bldg storage @ basement. add ada ramp inside storefront in compliance w/ abe program,install 2 (n) unisex restrm, 1 janitor closet, 2 kitchenette, replace 6 (e) skylight, add 2 skylight, create a rated passagDetails
voluntary structural improvement @ 1st & basement levels.(n) bldg storage @ basement. add ada ramp inside storefront in compliance w/ abe program,install 2 (n) unisex restrm, 1 janitor closet, 2 kitchenette, replace 6 (e) skylight, add 2 skylight, create a rated passag | $1,000,000 |
| Oct 14, 2022 | Completed final sign-off Apr 2024 | 2411 Washington St | lower level improvement & structural strengthening at 1st story; main & upper level improvements kitchen cabinets, flooring, paint & bath tile, paintDetails
lower level improvement & structural strengthening at 1st story; main & upper level improvements kitchen cabinets, flooring, paint & bath tile, paint | $150,000 |
| Mar 8, 2022 | Completed final sign-off May 2023 | 2200 Sacramento St | #1206. removal of flooring, kitchen cabinets, bathroom tile and counter tops. new finishes. installed and apartment painted. install new sound barrier under new wood floor and replace sheetrock in bathrooms and kitches. removal of flooring. no layout changes.Details
#1206. removal of flooring, kitchen cabinets, bathroom tile and counter tops. new finishes. installed and apartment painted. install new sound barrier under new wood floor and replace sheetrock in bathrooms and kitches. removal of flooring. no layout changes. | $450,000 |
| Jan 3, 2022 | Completed final sign-off Jan 2023 | 3835 26th St | remodel (5) bathrooms, remodel kitchens on 1/f & 2/f, add interior door from garage to house, modify closet & opening @ lower level, remove (2) columns @ lower kitchens, replace (1) ext door w/window, add (1) new door opening replace (4) windows same size (e) openings.Details
remodel (5) bathrooms, remodel kitchens on 1/f & 2/f, add interior door from garage to house, modify closet & opening @ lower level, remove (2) columns @ lower kitchens, replace (1) ext door w/window, add (1) new door opening replace (4) windows same size (e) openings. | $70,000 |
| Dec 17, 2020 | Completed final sign-off Nov 2021 | 1067 De Haro St | replace kitchen cabinets & appliances. repalce bathroom tiles, sinks, tub, showers & fixtures. new windows and deck doors (non street visible). new flooring w/ hydronic heating. new interior stairs and railigs.Details
replace kitchen cabinets & appliances. repalce bathroom tiles, sinks, tub, showers & fixtures. new windows and deck doors (non street visible). new flooring w/ hydronic heating. new interior stairs and railigs. | $128,000 |
| Sep 18, 2018 | Completed final sign-off Jun 2020 | 1312 Pacific Av | remove finish surfaces from kitchen & bathroomDetails
remove finish surfaces from kitchen & bathroom | $2,000 |
| Aug 16, 2018 | Completed final sign-off Mar 2019 | 739 Kansas St | cosmetic kitchen & bathroom remodel. lighting/fixtures & tile & stone & painting. in-kind, no structural work. comply w/ec150.0(k)3 & cec150.0(k)5.Details
cosmetic kitchen & bathroom remodel. lighting/fixtures & tile & stone & painting. in-kind, no structural work. comply w/ec150.0(k)3 & cec150.0(k)5. | $30,000 |
| Apr 10, 2018 | Completed final sign-off Nov 2021 | 1754 Fell St | basement: new foundation, replace (e) rear ratining walls; new ext. openings/int. layout; 1/f: new ext. door @ kitchen, new wood deck/stone patio, new ext. stair to basement; 2/f: new bathroom & closets, remove (e) brick chimney @ rear - not visible from street.Details
basement: new foundation, replace (e) rear ratining walls; new ext. openings/int. layout; 1/f: new ext. door @ kitchen, new wood deck/stone patio, new ext. stair to basement; 2/f: new bathroom & closets, remove (e) brick chimney @ rear - not visible from street. | $100,000 |
| Jan 31, 2017 | Expired or cancelled expired Apr 2021 | 1200 Gough St | #7a - kitchen remodel, new flooring, upgrade unit subpanel from 70 amp to 100 amp. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
#7a - kitchen remodel, new flooring, upgrade unit subpanel from 70 amp to 100 amp. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $500 |
| Feb 17, 2015 | Completed final sign-off Oct 2020 | 2728 Green St | no walls to be mvoed|fixtures & finishes: remove kitchen cabinets and countertops, install new and repair kitchen, all plumbing & electrical in existing locations. remove tub and tile in bathroom 1st floor, countertop & vanity & repaint bathroom; maher n/aDetails
no walls to be mvoed|fixtures & finishes: remove kitchen cabinets and countertops, install new and repair kitchen, all plumbing & electrical in existing locations. remove tub and tile in bathroom 1st floor, countertop & vanity & repaint bathroom; maher n/a | $30,000 |