Back to bathroom remodel contractors
Creggan Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Jul 2024 to Sep 2026
- Last 24 months
- 8 permits filed
11 permits since 2000: 6 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 1 completed, 4 in progress. Typically 0 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 2126 18th St | revision to permit# 202609037660: approved current permit - 2 bathrooms + kitchen replace in kind after demo. extended scope - reconfiguration of bath walls new layout, bath + kitchen, new appliances, added shower, replace (e) stair railings new finishes.Details
revision to permit# 202609037660: approved current permit - 2 bathrooms + kitchen replace in kind after demo. extended scope - reconfiguration of bath walls new layout, bath + kitchen, new appliances, added shower, replace (e) stair railings new finishes. | $220,000 |
| Sep 3, 2026 | In progress issued Sep 2026 | 2126 18th St | two bathrooms no plans remodel. one kitchen no plans remodel.Details
two bathrooms no plans remodel. one kitchen no plans remodel. | $25,000 |
| May 19, 2026 | In progress issued May 2026 | 101 Lombard St | unit 401e: interior remodel (e) kitchen and two bathrooms replace cabinets, finishes, fixtures, and appliances, add bathtub at primary bathroom, new non structural interior walls/vent chase as shown on plans. no structural or load bearing wall alterations. no change of use.Details
unit 401e: interior remodel (e) kitchen and two bathrooms replace cabinets, finishes, fixtures, and appliances, add bathtub at primary bathroom, new non structural interior walls/vent chase as shown on plans. no structural or load bearing wall alterations. no change of use. | $85,000 |
| Dec 24, 2025 | In progress issued Feb 2026 | 117 Fair Oaks St | demo & renovate condition area of (e) basement. 125 sf conditioned addition to (e) basement below (e) floors. conditioned area renovation to include: 1 (n) bedroom, 1 (n) bathroom. demo (e) closets at 1st fl to create (n) interior stair to basement. no expansion to building massing. no other changesDetails
demo & renovate condition area of (e) basement. 125 sf conditioned addition to (e) basement below (e) floors. conditioned area renovation to include: 1 (n) bedroom, 1 (n) bathroom. demo (e) closets at 1st fl to create (n) interior stair to basement. no expansion to building massing. no other changes | $175,000 |
| Jan 17, 2025 | Completed final sign-off Oct 2025 | 117 Fair Oaks St | bathroom remodel-replace tub/shower w/shower pan (in-kind)Details
bathroom remodel-replace tub/shower w/shower pan (in-kind) | $30,000 |