Back to bathroom remodel contractors
Creatively Built Inc
- Based in
- Novato
- On San Francisco permits
- Oct 2012 to Dec 2020
- Last 24 months
- 0 permits filed
25 permits since 2000: 17 completed, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 3 expired or cancelled. Typically 10 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2020 | Completed final sign-off May 2021 | 2234 Divisadero St | remodel one exisitng bathroom in-kind at basement.Details
remodel one exisitng bathroom in-kind at basement. | $25,000 |
| Jun 11, 2020 | Completed final sign-off May 2021 | 2234 Divisadero St | master bathroom and bath 2 remodel in-kind. replace 8 windows at east wall (garden side), same size same location replace 2 outside doors at east wall (garden side), same size same location. new siding at east wall.Details
master bathroom and bath 2 remodel in-kind. replace 8 windows at east wall (garden side), same size same location replace 2 outside doors at east wall (garden side), same size same location. new siding at east wall. | $150,000 |
| Sep 27, 2019 | Expired or cancelled expired Mar 2024 | 2622 Greenwich St | revision to 201610261228 excavation of basement level below the 1st level and at rear terrace. new stairs and elevator to service the basement to 1st fl new terrace at basement level. bedroom, full bath, playroom, storage/gymDetails
revision to 201610261228 excavation of basement level below the 1st level and at rear terrace. new stairs and elevator to service the basement to 1st fl new terrace at basement level. bedroom, full bath, playroom, storage/gym | $150,000 |
| Aug 23, 2019 | Completed final sign-off Nov 2019 | 650 Delancey St | unit 409. remodel of finishes in a multifamily residence including kitchen and 2 bathrooms.Details
unit 409. remodel of finishes in a multifamily residence including kitchen and 2 bathrooms. | $49,500 |
| Jan 11, 2019 | Completed final sign-off Jun 2019 | 336 Bradford St | rev to pa# 201803234441; top bathroom staying as is, living space improved, a few walls removedDetails
rev to pa# 201803234441; top bathroom staying as is, living space improved, a few walls removed | |
| Jul 25, 2017 | Completed final sign-off Feb 2019 | 2523 30th Av | demo existing lightwell deck. new habitable space with 2 new bedrooms, family room, media room, bathroom & laundry/utility room in existing non-habitable space at 1st floor. new windows at lightwell & rearDetails
demo existing lightwell deck. new habitable space with 2 new bedrooms, family room, media room, bathroom & laundry/utility room in existing non-habitable space at 1st floor. new windows at lightwell & rear | $106,694 |
| Oct 26, 2016 | Expired or cancelled expired Mar 2024 | 2622 Greenwich St | interior renovation & addition to (e) 2-unit building. 1st fl renovation & addition of more fl area. add entrance to upper fl from the lower/garge. 2nd fl add (n) kitchen, powder rm, family rm & stair to backyard. 3rd fl master renovation & 2nd bath renovation.Details
interior renovation & addition to (e) 2-unit building. 1st fl renovation & addition of more fl area. add entrance to upper fl from the lower/garge. 2nd fl add (n) kitchen, powder rm, family rm & stair to backyard. 3rd fl master renovation & 2nd bath renovation. | $195,800 |
| Mar 5, 2014 | Completed final sign-off Jun 2014 | 1800 18th Av | in kind replacement of e aluminum windows with new aluminum windows. remodel e media room and e bathroom. remodel of e kitchen. no change in occupancy, number of units, plumbing or parking.Details
in kind replacement of e aluminum windows with new aluminum windows. remodel e media room and e bathroom. remodel of e kitchen. no change in occupancy, number of units, plumbing or parking. | $25,000 |
| Oct 30, 2013 | Completed final sign-off Jun 2014 | 1800 18th Av | repair front entrance stairs in kind, bathroom remodel at 2nd fl; in occupancy, number of units, plumbing or parkingDetails
repair front entrance stairs in kind, bathroom remodel at 2nd fl; in occupancy, number of units, plumbing or parking | $25,000 |
| Sep 4, 2013 | Expired or cancelled expired May 2017 | 743 32nd Av | conversion of the rear of the garage into residential space-1 bedroom, 1 bathroom, closet & entry hall. construction of 1 hour exit passage through garage as a 2nd means of egress. insulate new rooms, no footprintDetails
conversion of the rear of the garage into residential space-1 bedroom, 1 bathroom, closet & entry hall. construction of 1 hour exit passage through garage as a 2nd means of egress. insulate new rooms, no footprint | $35,000 |