Back to bathroom remodel contractors
Creative Exterior Builders Dba: America'
- Based in
- Sacramento
- On San Francisco permits
- Apr 2011 to Aug 2018
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 36 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2011 | Completed final sign-off Dec 2011 | 1355 Hudson Av | install new fiber cement siding, replace windows- install 8 new windows, some visable from street. replace fixtures in bathroom, replace siding at front, rear and left side of the house.Details
install new fiber cement siding, replace windows- install 8 new windows, some visable from street. replace fixtures in bathroom, replace siding at front, rear and left side of the house. | $8,000 |