Crawford Construction
- Based in
- Santa Rosa
- On San Francisco permits
- May 2016 to Nov 2016
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 6 days from filing to permit and 344 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2016 | Completed final sign-off May 2017 | 365 Banks St | to comply with nov 201311971 item 2 & 7: add one bedroom, full bath, wic & mudroom on 1st. relocate interior stair between 1st & 2nd. replace (e) deck at rear of bldg. in kind, repair and reinforce (e) reatining wall &* foundation at perimeterDetails
to comply with nov 201311971 item 2 & 7: add one bedroom, full bath, wic & mudroom on 1st. relocate interior stair between 1st & 2nd. replace (e) deck at rear of bldg. in kind, repair and reinforce (e) reatining wall &* foundation at perimeter | $40,000 |
| May 11, 2016 | Completed final sign-off May 2017 | 365 Banks St | kitchen remodel, new cabinet, counter top new appliances, tile recess light, bathroom tiling, new tub, new vanity, toilet, recess lightDetails
kitchen remodel, new cabinet, counter top new appliances, tile recess light, bathroom tiling, new tub, new vanity, toilet, recess light | $30,000 |