Back to bathroom remodel contractors
Crana Windows & Doors Dba Kevin Mc Laugh
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Jan 2026
- Last 24 months
- 35 permits filed
424 permits since 2000: 379 completed, 3 in progress, 38 never finaled, 4 expired or cancelled.
Of the 38 never-finaled permits, 10 are 3 to 5 years old, 12 are 5 to 10 years old, 16 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2015 | Completed final sign-off Feb 2016 | 38 Newman St | repair/replace as necessary, sashes (6) at front in kind double-hung wood for wood replace bathroom window sashes w/fiberglass insert, not visible from street repair/replace 1 door, 1 pair of doors + sashes at 1 window at rear, wood for wood. no structural work to be doneDetails
repair/replace as necessary, sashes (6) at front in kind double-hung wood for wood replace bathroom window sashes w/fiberglass insert, not visible from street repair/replace 1 door, 1 pair of doors + sashes at 1 window at rear, wood for wood. no structural work to be done | $8,000 |