Back to bathroom remodel contractors
Cowboy Construction West
- Based in
- Novato
- On San Francisco permits
- Mar 2017 to May 2022
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 610 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2022 | Completed final sign-off Sep 2023 | 789 Buena Vista Ave West Av | 1 kitchen refinish cabinets update flooring countertops. 1 bathroom replace and update flooring tile: new paint throughout apartment: no structural workDetails
1 kitchen refinish cabinets update flooring countertops. 1 bathroom replace and update flooring tile: new paint throughout apartment: no structural work | $11,500 |
| Apr 15, 2021 | Completed final sign-off Dec 2022 | 2361 Jackson St | updating cabinets and finishes in kitchen and bathroom; replaceing countertops; no structural work.Details
updating cabinets and finishes in kitchen and bathroom; replaceing countertops; no structural work. | $18,000 |
| May 16, 2017 | Completed final sign-off Dec 2019 | 789 Buena Vista West Av | unit 101 -replace bathroom floor tiles, and replace toilet; replace bathroom vanity and sink; install kitchen backsplash; regrout shower wall tiles; less on 50%Details
unit 101 -replace bathroom floor tiles, and replace toilet; replace bathroom vanity and sink; install kitchen backsplash; regrout shower wall tiles; less on 50% | $2,000 |