Back to bathroom remodel contractors
Cortland Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Sep 2007
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2006 | Never finaled issued Sep 2006, no final | 2227 Cecilia Av | rapair plumpbing, fixtures, replace bath tub, shower, toilet, vanity family room + garage install new insulation and drywall.Details
rapair plumpbing, fixtures, replace bath tub, shower, toilet, vanity family room + garage install new insulation and drywall. | $20,000 |
| Mar 14, 2005 | Completed final sign-off Jun 2005 | 176 San Felipe Av | renovation of (e)bathroom.replace bath tub,sink,toilet,wall tile,flooringDetails
renovation of (e)bathroom.replace bath tub,sink,toilet,wall tile,flooring | $4,700 |