Back to bathroom remodel contractors
Cornelius Regan Const.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Nov 2005
- Last 24 months
- 0 permits filed
49 permits since 2000: 26 completed, 2 never finaled, 21 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 6 completed, 9 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2005 | Completed final sign-off Aug 2005 | 300 Beale St | replace kitchen & bath countertops. replace fixtures and appliance.all interior wk. no stru wk.Details
replace kitchen & bath countertops. replace fixtures and appliance.all interior wk. no stru wk. | $5,000 |
| Jul 8, 2005 | Completed final sign-off Jul 2006 | 2717 Greenwich St | dry rot repair at basemnet about 150 sq ft & front porch about 100 sq ft remodel kit & 2 baths at loDetails
dry rot repair at basemnet about 150 sq ft & front porch about 100 sq ft remodel kit & 2 baths at lo | $45,000 |
| Jun 27, 2005 | Completed final sign-off Dec 2005 | 2521 Chestnut St | remodel (1) kitchen (1) bathroom, change (5) windows (retrofit) and (1) skylight, hardwood floor; anDetails
remodel (1) kitchen (1) bathroom, change (5) windows (retrofit) and (1) skylight, hardwood floor; an | $15,000 |
| Mar 29, 2005 | Expired or cancelled expired Jan 2007 | 2330 Bay St | one kitchen & 2 bathrooms, one half bath remodeled, new tile fixtures, cabinetry & countertops, newDetails
one kitchen & 2 bathrooms, one half bath remodeled, new tile fixtures, cabinetry & countertops, new | $29,500 |
| Feb 1, 2005 | Completed final sign-off Mar 2006 | 2440 Bush St | kitchen and 2 bath remodel. new fixtures,appliances, cabinets, tile, lighting. move furnace, replaceDetails
kitchen and 2 bath remodel. new fixtures,appliances, cabinets, tile, lighting. move furnace, replace | $27,000 |
| Jan 25, 2005 | Expired or cancelled expired Jan 2007 | 554 30th Av | extend lightwell area to be part of new kitchen. add gas,elec,plumb to kitchen. add new bath for....Details
extend lightwell area to be part of new kitchen. add gas,elec,plumb to kitchen. add new bath for.... | $20,000 |
| Sep 24, 2004 | Expired or cancelled expired Sep 2006 | 566 48th Av | dr rot leak repair at rear sunroom,6 windows and door in kind,rear gr flr,bath remodel w/new fixtureDetails
dr rot leak repair at rear sunroom,6 windows and door in kind,rear gr flr,bath remodel w/new fixture | $10,000 |
| Sep 20, 2004 | Expired or cancelled expired Oct 2005 | 226 Mallorca Wy | bathroom remodel, solar tube lighting, 5' from ext. wall, installed new baseboard throughout, 4 newDetails
bathroom remodel, solar tube lighting, 5' from ext. wall, installed new baseboard throughout, 4 new | $12,000 |
| Jul 26, 2004 | Expired or cancelled expired Jan 2008 | 480 Colon Av | remodel kitchen & bathDetails
remodel kitchen & bath | $20,000 |
| Jul 22, 2004 | Completed final sign-off Dec 2004 | 385 10th St | remodel kitchen&bath-demo no structural wall.enlarge bathroom.install washer/dryer,recess lights,jacDetails
remodel kitchen&bath-demo no structural wall.enlarge bathroom.install washer/dryer,recess lights,jac | $11,600 |
| Jun 3, 2004 | Expired or cancelled expired Feb 2007 | 330 Avila St | third floor addition with 3 bedrooms & 2 bathrooms with stair to (e) 2nd floor. 2nd means of egress*Details
third floor addition with 3 bedrooms & 2 bathrooms with stair to (e) 2nd floor. 2nd means of egress* | $150,000 |
| Jul 28, 2003 | Expired or cancelled expired Mar 2006 | 26 Gladstone Dr | rev. of door location for bedroom entrance & bathroomDetails
rev. of door location for bedroom entrance & bathroom | |
| Nov 21, 2002 | Expired or cancelled expired Mar 2007 | 2555 Webster St | remodel 2 baths at 2nd level remodel 2bath top level,new master bath/closet.wall surface removal asDetails
remodel 2 baths at 2nd level remodel 2bath top level,new master bath/closet.wall surface removal as | $30,000 |
| Apr 1, 2002 | Completed final sign-off Sep 2002 | 242 Missouri St | remodel bathroom and storage area, new laundry areaDetails
remodel bathroom and storage area, new laundry area | $15,000 |
| Feb 20, 2002 | Expired or cancelled expired Aug 2002 | 156 Landers St | kitchen & bath remodel on top unit,cabinets,tile & fixts,plumbing & electric upgrade sheetrock repaiDetails
kitchen & bath remodel on top unit,cabinets,tile & fixts,plumbing & electric upgrade sheetrock repai | $20,000 |