Back to bathroom remodel contractors
Cooke And Mccann Inc
- Based in
- San Bruno
- On San Francisco permits
- Aug 2014 to May 2024
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 180 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 26, 2023 | Completed final sign-off Aug 2024 | 357 Elizabeth St | remodel to e 2 story sfd including kitchen. new bathroom in existing envelope. all associated plumbing, elec, mech included. no struc work, no expansion of e building envelope.Details
remodel to e 2 story sfd including kitchen. new bathroom in existing envelope. all associated plumbing, elec, mech included. no struc work, no expansion of e building envelope. | $65,000 |
| Oct 31, 2019 | Completed final sign-off Aug 2021 | 248 Colon Av | remodel 1st fl. add 2 bedrooms, den, 1 full bath & media room, relocate existing stair to connect 1st fl to 2nd fl. lower (e) rear yard to create (n) hardscape. windows to be alum wood clad.Details
remodel 1st fl. add 2 bedrooms, den, 1 full bath & media room, relocate existing stair to connect 1st fl to 2nd fl. lower (e) rear yard to create (n) hardscape. windows to be alum wood clad. | $250,000 |
| Jun 29, 2015 | Completed final sign-off Jul 2016 | 609 Haight St | change of use - create new residential unit within extg unoccupied ground floor. no structure work. non bearing only. add kitchen, 2 baths, 2 bedrooms. replace windows and doors. install 2 hour ceiling and sprinkler on ground floor per nfpa13r.Details
change of use - create new residential unit within extg unoccupied ground floor. no structure work. non bearing only. add kitchen, 2 baths, 2 bedrooms. replace windows and doors. install 2 hour ceiling and sprinkler on ground floor per nfpa13r. | $62,000 |
| Aug 8, 2014 | Completed final sign-off Jun 2016 | 605 Haight St | (n) reinforced conc. foundation throughout. replace (e) wood posts & beams w/steel members. install accessible bathroom & ramp. no exterior work.Details
(n) reinforced conc. foundation throughout. replace (e) wood posts & beams w/steel members. install accessible bathroom & ramp. no exterior work. | $120,000 |