Back to bathroom remodel contractors
Cook Construction
- Based in
- San Carlos
- On San Francisco permits
- Feb 2005 to Mar 2016
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 expired or cancelled. Typically 8 days from filing to permit and 440 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2016 | Completed final sign-off Jan 2018 | 2155 40th Av | add half bath at 1st floor and legalize (e) bedroom @ 1st floor.Details
add half bath at 1st floor and legalize (e) bedroom @ 1st floor. | $15,000 |
| May 9, 2012 | Completed final sign-off Sep 2012 | 1520 Florida St | remove non permitted kitchen cabinets, bath tub. open walls for correction of nov electrical cap and remove all non permitted plumbingDetails
remove non permitted kitchen cabinets, bath tub. open walls for correction of nov electrical cap and remove all non permitted plumbing | $2,300 |
| Sep 8, 2011 | Expired or cancelled expired Dec 2012 | 614 Hearst Av | addition of 2 new bedrooms and one bathroom in existing basement. & new window at frontDetails
addition of 2 new bedrooms and one bathroom in existing basement. & new window at front | $39,994 |
| Sep 29, 2010 | Completed final sign-off Nov 2011 | 2279 15th St | dry rot repairs to bath flrs & framing. new closet & door in 2281 bedroom, dry rot repairs to (e) closet. add new laundry to unit 2281. replace (e) sidewall & rear windows with new, windows to be sized to (e) openings. not visible from the streetDetails
dry rot repairs to bath flrs & framing. new closet & door in 2281 bedroom, dry rot repairs to (e) closet. add new laundry to unit 2281. replace (e) sidewall & rear windows with new, windows to be sized to (e) openings. not visible from the street | $10,000 |
| Jul 28, 2010 | Completed final sign-off Nov 2011 | 2279 15th St | remodel kitchen and bathroom in each unit. new cabinets, counters, bathroom fixtures.Details
remodel kitchen and bathroom in each unit. new cabinets, counters, bathroom fixtures. | $20,000 |