Construction Unlimited
- Based in
- San Mateo
- On San Francisco permits
- Jan 2001 to Apr 2023
- Last 24 months
- 0 permits filed
24 permits since 2000: 19 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 4 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2023 | Completed final sign-off Jun 2023 | 241 Waller St | kitchen bath room remodel: fire dagmage around stove in kitchen cottage (241 waller). note: cabinets to retain only one cabinet added over refrigerator - new appliances; for bathroom -remove (e) bidet, replaced toilet and add new floor. not complete kitchen or bathroom remodel.Details
kitchen bath room remodel: fire dagmage around stove in kitchen cottage (241 waller). note: cabinets to retain only one cabinet added over refrigerator - new appliances; for bathroom -remove (e) bidet, replaced toilet and add new floor. not complete kitchen or bathroom remodel. | $23,000 |
| Dec 15, 2014 | Completed final sign-off Feb 2017 | 497 Valley St | proposed reproframming of approved pa# 200701101441, addition of one 1/2 bath, elevator and revision to approved framing and foundation plan. no expansion or modification to approved bldg envelope, no change to approved site/roof plan or elevation.Details
proposed reproframming of approved pa# 200701101441, addition of one 1/2 bath, elevator and revision to approved framing and foundation plan. no expansion or modification to approved bldg envelope, no change to approved site/roof plan or elevation. | |
| Aug 14, 2012 | Completed final sign-off Nov 2012 | 72 Winfield St | kitchen & bathroom remodel-replace cabinets, tile work & countertop installationDetails
kitchen & bathroom remodel-replace cabinets, tile work & countertop installation | $8,000 |
| Sep 26, 2001 | Completed final sign-off Nov 2001 | 4344 17th St | provide electrical for dishwasher, install gfi's in kitchen, tile work in bathroomDetails
provide electrical for dishwasher, install gfi's in kitchen, tile work in bathroom | $20,000 |