Back to bathroom remodel contractors
Consolidated Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Jun 2011 to Apr 2023
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 15 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2022 | Completed final sign-off Sep 2023 | 2327 Bay St | 3/f -reconfiguration of primary bedroom to add a new bathroom and reconfigure laundry area.Details
3/f -reconfiguration of primary bedroom to add a new bathroom and reconfigure laundry area. | $50,000 |
| Jun 9, 2022 | Completed final sign-off May 2023 | 2774 Union St | adding structural drawing to pa# 202205164343. amending kitchen & bathroom remodel. one wall found to be load bearing. adding beam and lvl to floor joists overhead per building engineer plan.Details
adding structural drawing to pa# 202205164343. amending kitchen & bathroom remodel. one wall found to be load bearing. adding beam and lvl to floor joists overhead per building engineer plan. | $20,000 |
| May 16, 2022 | Completed final sign-off May 2023 | 2774 Union St | kitchen and bath remodel, changing partiation wallsDetails
kitchen and bath remodel, changing partiation walls | $45,000 |
| Apr 6, 2021 | Completed final sign-off Aug 2021 | 529 Duboce Av | unit b kitchen and bath remodel demo and infill wallsDetails
unit b kitchen and bath remodel demo and infill walls | $30,000 |
| Nov 25, 2014 | Never finaled issued Dec 2014, no final | 542 Valley St | interior remodel of two second floor bathrooms. install 4 new skylights and relocate 3 existing skylights.Details
interior remodel of two second floor bathrooms. install 4 new skylights and relocate 3 existing skylights. | $30,000 |
| Dec 4, 2012 | Completed final sign-off Apr 2013 | 2860 Pierce St | new water closets (toilet & sink) on unit #1 @ basement & unit #5 @ 1st floor, kitchen & bath upgrade on unit #4 @ 3rd floor.Details
new water closets (toilet & sink) on unit #1 @ basement & unit #5 @ 1st floor, kitchen & bath upgrade on unit #4 @ 3rd floor. | $40,000 |
| Jun 21, 2011 | Completed final sign-off Apr 2012 | 542 Valley St | remove wall at kitchen, replace e door at living room with new window. replace e window at study with new window, convert study to tea room, new window at master bath and bedroom. voluntary plywood strengthening (n) grade beam. kitchen remodel, (n) post & foundation per plan.Details
remove wall at kitchen, replace e door at living room with new window. replace e window at study with new window, convert study to tea room, new window at master bath and bedroom. voluntary plywood strengthening (n) grade beam. kitchen remodel, (n) post & foundation per plan. | $19,000 |