Back to bathroom remodel contractors
Commins Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Apr 2017
- Last 24 months
- 0 permits filed
54 permits since 2000: 47 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 19 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2017 | Completed final sign-off Jan 2018 | 151 Juanita Wy | remodel 1/f master bedroom & bath, relocate stair between floors.Details
remodel 1/f master bedroom & bath, relocate stair between floors. | $45,000 |
| Sep 15, 2015 | Completed final sign-off Dec 2015 | 239 Molimo Dr | bath room remodel (top floor) replace wall surfaces, tile, plumbing, fixtures, lighting, motor vent, window sash, trim and accessories, replaced on bath street facing window new wood casement window.Details
bath room remodel (top floor) replace wall surfaces, tile, plumbing, fixtures, lighting, motor vent, window sash, trim and accessories, replaced on bath street facing window new wood casement window. | $17,000 |
| Oct 9, 2014 | Completed final sign-off May 2016 | 665 Banks St | 3rd floor areas including two bathrooms, closets, new furnace, & new windows. legalize (e) ground floor 1/2 bathroom (toilet & sink).Details
3rd floor areas including two bathrooms, closets, new furnace, & new windows. legalize (e) ground floor 1/2 bathroom (toilet & sink). | $100,000 |
| Dec 10, 2013 | Completed final sign-off May 2015 | 750 27th St | creation of new 1 bedroom, 1 bath apartment with kitchenette. new dydronic heating system, replace (e) furnace. exterior canopy, stoop, lighting. new apartments is within (e) shell of building with new windows & exterior doors. non sprinklered.Details
creation of new 1 bedroom, 1 bath apartment with kitchenette. new dydronic heating system, replace (e) furnace. exterior canopy, stoop, lighting. new apartments is within (e) shell of building with new windows & exterior doors. non sprinklered. | $100,000 |
| Apr 22, 2013 | Completed final sign-off Jun 2015 | 330 Brentwood Av | rear additions on 2 levels of (e) split level home and interior remodeling of kitchen, bathrooms and bedrooms a total of 270.4 s.f. of additional floor area 2987.4 total proposed floor area + deck at rearDetails
rear additions on 2 levels of (e) split level home and interior remodeling of kitchen, bathrooms and bedrooms a total of 270.4 s.f. of additional floor area 2987.4 total proposed floor area + deck at rear | $600,000 |
| Feb 16, 2012 | Completed final sign-off Apr 2012 | 684 Peralta Av | kitchen & bath remodel: replace wall, ceiling & floor surface, new cabinets, and appliances electric & lighting upgrade, insulation bath remodel: new fixtures and tileDetails
kitchen & bath remodel: replace wall, ceiling & floor surface, new cabinets, and appliances electric & lighting upgrade, insulation bath remodel: new fixtures and tile | $28,000 |
| Oct 6, 2011 | Completed final sign-off Dec 2011 | 1325 Mason St | remodel unit 104 kitchen, repl wall & ceiling w/ 5/8" typex surfaces, gypsum board, upgrade electric to kit & bath,install new cabinets & appliances, bath: inst motor vent, upgrade elec, repl wall & ceiling surface, install tile tub surround, repl e window (in lightwell),non structural remodelDetails
remodel unit 104 kitchen, repl wall & ceiling w/ 5/8" typex surfaces, gypsum board, upgrade electric to kit & bath,install new cabinets & appliances, bath: inst motor vent, upgrade elec, repl wall & ceiling surface, install tile tub surround, repl e window (in lightwell),non structural remodel | $22,000 |
| Jul 6, 2011 | Completed final sign-off Sep 2011 | 39 Sylvan Dr | constuct new bath in e family room. upgrade electric family room. install rated door to garage. install drywall ceiling and wallsDetails
constuct new bath in e family room. upgrade electric family room. install rated door to garage. install drywall ceiling and walls | $28,000 |
| Mar 14, 2011 | Completed final sign-off Jun 2011 | 1375 09th Av | bathroom improvements (barrier removal) for restaurant only.Details
bathroom improvements (barrier removal) for restaurant only. | $20,000 |
| Jan 24, 2011 | Completed final sign-off Apr 2011 | 11 Perego Tr | one bathroom remodel: new shower enclosure, sink, & toilet. replace ceiling fan.Details
one bathroom remodel: new shower enclosure, sink, & toilet. replace ceiling fan. | $9,000 |
| Oct 8, 2009 | Completed final sign-off Feb 2010 | 778 Great Hy | kitchen remodel, replace cabinets, counters, appliances, 500 sf ceiling and wall surfaces.5/8 type gyp bd. new lighting, elec upgrades. master bath, tub, tile surround, constrol fixture, common bath, master bath, replace lave cabinet, top and fixture. new low flow toilets, new motor vents 778 grt hwDetails
kitchen remodel, replace cabinets, counters, appliances, 500 sf ceiling and wall surfaces.5/8 type gyp bd. new lighting, elec upgrades. master bath, tub, tile surround, constrol fixture, common bath, master bath, replace lave cabinet, top and fixture. new low flow toilets, new motor vents 778 grt hw | $50,000 |
| Aug 4, 2009 | Completed final sign-off Nov 2009 | 367 Kensington Wy | bathroom remodel, replace plumbing fixtures, new wall surfaces, floor tile, lighting, motor vent.Details
bathroom remodel, replace plumbing fixtures, new wall surfaces, floor tile, lighting, motor vent. | $23,000 |
| Jan 11, 2008 | Completed final sign-off Apr 2008 | 4324 25th St | bathroom remodel 2nd floor. rpelace wall and ceiling surfaces. insulate ceiling and outside wall. install motorvent and high efficiency lighting. install tile and tub surround and tile floor. install new plumbing fixtures.Details
bathroom remodel 2nd floor. rpelace wall and ceiling surfaces. insulate ceiling and outside wall. install motorvent and high efficiency lighting. install tile and tub surround and tile floor. install new plumbing fixtures. | $16,000 |
| Apr 10, 2007 | Completed final sign-off Apr 2008 | 5001 Diamond Heights Bl | bathroom remodel (top floor) : install new lighting, wall surfaces, fixtures, tub surround & floor tile, install motor vent. replace wall & ceiling surfaces various places (top) third floor.Details
bathroom remodel (top floor) : install new lighting, wall surfaces, fixtures, tub surround & floor tile, install motor vent. replace wall & ceiling surfaces various places (top) third floor. | $22,000 |
| Dec 8, 2006 | Completed final sign-off May 2007 | 750 27th St | bathroom remodel: new fixtures, lighting, wall & ceiling surfaces. lighting will utilize occupancy sensor.Details
bathroom remodel: new fixtures, lighting, wall & ceiling surfaces. lighting will utilize occupancy sensor. | $15,000 |
| Aug 8, 2006 | Completed final sign-off Jan 2007 | 140 Westmoorland Dr | grd fl: family room-remove one small side lot window, construct closet storage, insullate exterior walls, replace doors. bathroom-replace (fixtures, wall, floor & ceiling surfaces). 1st fl: kitchen remodel: replace (fixtures, appliances, cabinets & counter) install lighting & insullation. new wallDetails
grd fl: family room-remove one small side lot window, construct closet storage, insullate exterior walls, replace doors. bathroom-replace (fixtures, wall, floor & ceiling surfaces). 1st fl: kitchen remodel: replace (fixtures, appliances, cabinets & counter) install lighting & insullation. new wall | $60,000 |
| Jun 2, 2005 | Completed final sign-off Oct 2005 | 750 27th St | 3rd/fl remodel:build new bathroom as per plans. replace (e) windows, install one round & 2 block.Details
3rd/fl remodel:build new bathroom as per plans. replace (e) windows, install one round & 2 block. | $70,000 |
| Mar 8, 2004 | Completed final sign-off May 2004 | 933 Castro St | g/f bathroom remodel,reposition fixtures,construct partition walls,replace backdoor,install doorDetails
g/f bathroom remodel,reposition fixtures,construct partition walls,replace backdoor,install door | $9,000 |
| Mar 5, 2003 | Completed final sign-off Mar 2012 | 1568 Shrader St | bathroom remodel & replace walls, fixtures, lighting, window sash.Details
bathroom remodel & replace walls, fixtures, lighting, window sash. | $12,500 |
| Jul 27, 2000 | Expired or cancelled expired Jan 2001 | 565 Junipero Serra Bl | remodel bathroom and replace in kind windowsDetails
remodel bathroom and replace in kind windows | $12,000 |