Comfort International Inc
- Based in
- San Jose
- On San Francisco permits
- Dec 2025 to Dec 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2025 | Expired or cancelled withdrawn Mar 2026 | 171 02nd St | demolish existing old boiler. disconnect pipes, power and gas. install new boiler (model# rbi dw600, sn# 052599780, 475 lbs) same capacity, same size, and reconnect pipes, power and gas.Details
demolish existing old boiler. disconnect pipes, power and gas. install new boiler (model# rbi dw600, sn# 052599780, 475 lbs) same capacity, same size, and reconnect pipes, power and gas. | $23,000 |