Back to bathroom remodel contractors
Colvin Construction Dba A A Construction
- Based in
- Isleton
- On San Francisco permits
- Jun 2009 to Oct 2021
- Last 24 months
- 0 permits filed
36 permits since 2000: 27 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 never finaled. Typically 4 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 27, 2019 | Completed final sign-off Sep 2025 | 3940 Lawton St | rear horizontal addition @ 1st & 2nd fl for new master bedroom, closet & bath @ 2nd fl, roof deck over. 1st floor addition. new adu under permitDetails
rear horizontal addition @ 1st & 2nd fl for new master bedroom, closet & bath @ 2nd fl, roof deck over. 1st floor addition. new adu under permit | $200,000 |
| Jun 13, 2019 | Completed final sign-off Jun 2020 | 737 Victoria St | new a.d.u. @ existing rear garage structure as per ordinance 162-16. new unit to contain living/sleeping kitchen area, bath & closetDetails
new a.d.u. @ existing rear garage structure as per ordinance 162-16. new unit to contain living/sleeping kitchen area, bath & closet | $80,000 |
| Dec 20, 2016 | Completed final sign-off May 2019 | 1570 Plymouth Av | renovation of 1st floor to update stair to basement, existing bath; creating conditioned space at basement for new family room; bath, 2 bedrooms, laundry & exterior patio & decking at rear. new window openings @ secondary elevationsDetails
renovation of 1st floor to update stair to basement, existing bath; creating conditioned space at basement for new family room; bath, 2 bedrooms, laundry & exterior patio & decking at rear. new window openings @ secondary elevations | $150,000 |
| Dec 14, 2016 | Completed final sign-off May 2019 | 1570 Plymouth Av | horizontal addition at 1 st flr above existing basement level garage to create a master bath room & closet area.Details
horizontal addition at 1 st flr above existing basement level garage to create a master bath room & closet area. | $125,000 |
| Feb 3, 2016 | Completed final sign-off Jan 2019 | 606 16th Av | renovations & reconfiguration of kitchen & 1/2 bath at 2nd floor, new interior stair to 1st flr w/expansion of conditioned space to 1st flr to include new family rm, bedrm/guest & bath; expansion of 1st flr below existing 2nd floor; reconfiguration of bath & addition of master bath at 3rd floor.Details
renovations & reconfiguration of kitchen & 1/2 bath at 2nd floor, new interior stair to 1st flr w/expansion of conditioned space to 1st flr to include new family rm, bedrm/guest & bath; expansion of 1st flr below existing 2nd floor; reconfiguration of bath & addition of master bath at 3rd floor. | $90,000 |
| Apr 29, 2014 | Completed final sign-off Jan 2016 | 142 Ewing Tr | revision to app# 201401277158 for interior renovations of kitchen,living, & dining room areas, convert powder room to full bath, reconfigure , master bath at 2nd flr, eliminate one bath, reconfure bedroom & laundry area on 1st flr, reconfigure side windows @ kitchen & deck add new rear window 1st fDetails
revision to app# 201401277158 for interior renovations of kitchen,living, & dining room areas, convert powder room to full bath, reconfigure , master bath at 2nd flr, eliminate one bath, reconfure bedroom & laundry area on 1st flr, reconfigure side windows @ kitchen & deck add new rear window 1st f | $20,000 |
| Mar 4, 2014 | Never finaled issued Dec 2014, no final | 242 18th Av | horizontal addition of new bedroom & bath @ 2nd fl, two bedroom & two baths, family room, laundry @ 1st flr and new internal stair between flrs, roof deck @ 2nd floor over new 1st flr addition.Details
horizontal addition of new bedroom & bath @ 2nd fl, two bedroom & two baths, family room, laundry @ 1st flr and new internal stair between flrs, roof deck @ 2nd floor over new 1st flr addition. | $200,000 |
| Jan 27, 2014 | Completed final sign-off Jan 2016 | 142 Ewing Tr | renovate existing kitchen & bathroom on main floor. no new wall & no existing wall relocation. lighting for kitchen & bathroom remodel shall comply with cec 150(k)8 & 150(k)10.Details
renovate existing kitchen & bathroom on main floor. no new wall & no existing wall relocation. lighting for kitchen & bathroom remodel shall comply with cec 150(k)8 & 150(k)10. | $30,000 |
| Aug 23, 2013 | Completed final sign-off Dec 2013 | 1759 Oak St | relocate bathroom & add closet.Details
relocate bathroom & add closet. | $5,000 |
| Nov 5, 2012 | Completed final sign-off Feb 2013 | 1727 Lyon St | renovation of (e) bathroom, conversion of (e) laundry room into a bathroom. relocation of laundry room, reconfiguration of clsoets in 2 bedroomsDetails
renovation of (e) bathroom, conversion of (e) laundry room into a bathroom. relocation of laundry room, reconfiguration of clsoets in 2 bedrooms | $50,000 |
| Nov 4, 2011 | Completed final sign-off Jun 2012 | 739 Victoria St | remodel kitchen (1st floor), remodel bathroom (2nd floor) & closet. replace aluminum windows installed in 1987 with wood clad (in front), plywood strengthening walls @ basement onlyDetails
remodel kitchen (1st floor), remodel bathroom (2nd floor) & closet. replace aluminum windows installed in 1987 with wood clad (in front), plywood strengthening walls @ basement only | $38,000 |
| Oct 12, 2011 | Completed final sign-off Jun 2012 | 739 Victoria St | non-structural / exploritorive demolition of existing kitchen & bathroom.Details
non-structural / exploritorive demolition of existing kitchen & bathroom. | $2,000 |
| Apr 6, 2011 | Completed final sign-off Jan 2012 | 168 16th Av | convert part of 1st floor (garage) into a family rm, bedrom & new bathrm, infill below (e) 2nd fl rear area, renovate 2 (e) bathroom at 3rd fl, replace front windows with wood double hung windows. add decorative trim at front facade & widen (e) garage door openingDetails
convert part of 1st floor (garage) into a family rm, bedrom & new bathrm, infill below (e) 2nd fl rear area, renovate 2 (e) bathroom at 3rd fl, replace front windows with wood double hung windows. add decorative trim at front facade & widen (e) garage door opening | $80,000 |
| Jun 3, 2009 | Completed final sign-off Sep 2009 | 1864 Golden Gate Av | addition of 1/2 bath at storage level and add a uitlity sinkDetails
addition of 1/2 bath at storage level and add a uitlity sink | $5,000 |