Back to bathroom remodel contractors
Columba Anthony Duffy
- Based in
- San Rafael
- On San Francisco permits
- Sep 2001 to Aug 2026
- Last 24 months
- 2 permits filed
52 permits since 2000: 26 completed, 2 in progress, 4 never finaled, 20 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 8 completed, 1 never finaled, 2 expired or cancelled. Typically 2 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2021 | Completed final sign-off Jan 2024 | 142 28th Av | at basement, create habitable space including a media room, full bathroom, mechanical room, and a new stair from the 1/f. on level 1, remodel the kitchen, remove a full bathroom and create a half bath. new laundry room at level 2. new windows/doorsDetails
at basement, create habitable space including a media room, full bathroom, mechanical room, and a new stair from the 1/f. on level 1, remodel the kitchen, remove a full bathroom and create a half bath. new laundry room at level 2. new windows/doors | $250,000 |
| Nov 27, 2018 | Completed final sign-off Jul 2019 | 101 Seacliff Av | rev to pa21810233922: reduction in scope of work: no longer replacing the shower in the bathroom on 1/f. remove shower from bathroom into powder room/half-bathroom.Details
rev to pa21810233922: reduction in scope of work: no longer replacing the shower in the bathroom on 1/f. remove shower from bathroom into powder room/half-bathroom. | |
| Aug 15, 2018 | Completed final sign-off Jul 2019 | 101 Seacliff Av | interior reconfiguration of (e) kitchen and au pair bed and bath. installation of new plm fixtures & appliances per floor plan. installation of new flooring and other finishes as specified by ownerDetails
interior reconfiguration of (e) kitchen and au pair bed and bath. installation of new plm fixtures & appliances per floor plan. installation of new flooring and other finishes as specified by owner | $60,000 |
| Mar 15, 2016 | Completed final sign-off Aug 2016 | 386 Oxford St | remodel kitchen, add a master bath, reconfigure bedroom walls, add skylights, master closet moves to new location. skylights less than 20% of roof area.Details
remodel kitchen, add a master bath, reconfigure bedroom walls, add skylights, master closet moves to new location. skylights less than 20% of roof area. | $100,000 |
| Feb 19, 2014 | Completed final sign-off Feb 2015 | 115 Seacliff Av | interior remodel of entry, kitchen and 2 bathrooms, with no change to bldg envelope, footprint, or conditioned floor area. 2 new windows added, one window restored in original location. most remaining windows altered or replaced to match extg. 2 skylights removed, 3 new skylights added,Details
interior remodel of entry, kitchen and 2 bathrooms, with no change to bldg envelope, footprint, or conditioned floor area. 2 new windows added, one window restored in original location. most remaining windows altered or replaced to match extg. 2 skylights removed, 3 new skylights added, | $250,000 |
| Jul 23, 2013 | Completed final sign-off Sep 2016 | 254 Dellbrook Av | int remodel of (e) sfd-adding a new bathroom at ground level & upgrading 9e) laundry room. work on upper level include reconfiguring closets & remodeling (e) bathroom to create a master suiteDetails
int remodel of (e) sfd-adding a new bathroom at ground level & upgrading 9e) laundry room. work on upper level include reconfiguring closets & remodeling (e) bathroom to create a master suite | $30,000 |
| Nov 28, 2012 | Completed final sign-off Feb 2013 | 555 Howard St | tenant improvement for indoor golf driving range. new finishes, non-structural partitions, electrial and plumbing upgrades to bathrooms.Details
tenant improvement for indoor golf driving range. new finishes, non-structural partitions, electrial and plumbing upgrades to bathrooms. | $44,418 |
| Sep 6, 2012 | Expired or cancelled expired Jun 2025 | 2041 Pierce St | entire bldg remodel of 5 unit bldg. to include 5 (n) kitchens & 5 (n) bathrooms. removal of fire escape & construction of conforming exit stairs. extension of (e) dormer only for head height on north side. this remodel will not add square footage. garage approved under pa# 2011/09/23/5392.Details
entire bldg remodel of 5 unit bldg. to include 5 (n) kitchens & 5 (n) bathrooms. removal of fire escape & construction of conforming exit stairs. extension of (e) dormer only for head height on north side. this remodel will not add square footage. garage approved under pa# 2011/09/23/5392. | $500,000 |
| Jul 23, 2012 | Never finaled issued Jul 2012, no final | 1954 Union St | remove floor covering and shelling. replace light fixture only. replace toilet and sink only. smooth out textured walls. new floor covering. replace fixtures in ground floor bathroomDetails
remove floor covering and shelling. replace light fixture only. replace toilet and sink only. smooth out textured walls. new floor covering. replace fixtures in ground floor bathroom | $5,000 |
| Jan 26, 2012 | Completed final sign-off Apr 2012 | 2695 Sacramento St | 1 bathroom, new faucets, sink and shower. renew pa #201104274926. remodel (e) bathroom in kind. note: additional unit under pa# 201006245596.Details
1 bathroom, new faucets, sink and shower. renew pa #201104274926. remodel (e) bathroom in kind. note: additional unit under pa# 201006245596. | $2,000 |
| Jan 24, 2007 | Expired or cancelled expired Nov 2008 | 4047 25th St | demolition to interior spaces and additon of bedroom on 2nd floor and new kitchen/bathrooms. final inspection: 200503248358Details
demolition to interior spaces and additon of bedroom on 2nd floor and new kitchen/bathrooms. final inspection: 200503248358 |