Back to bathroom remodel contractors
Coit Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Dec 2025
- Last 24 months
- 2 permits filed
17 permits since 2000: 9 completed, 2 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 3 completed, 1 in progress, 4 never finaled. Typically 99 days from filing to permit and 332 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2025 | In progress issued Nov 2025 | 1435 Monterey Bl | interior remodel, 1st level convert existing sauna room to a powder room, replace existing sink, 2nd level remodel existing kitchen, powerder room, 3rd level remodel 2 existing bathrooms, convert window to sliding door and add a landingDetails
interior remodel, 1st level convert existing sauna room to a powder room, replace existing sink, 2nd level remodel existing kitchen, powerder room, 3rd level remodel 2 existing bathrooms, convert window to sliding door and add a landing | $90,000 |
| Jul 17, 2024 | Completed final sign-off Jun 2025 | 1201 08th Av | unit #3: kitchen and bathroom remodel in kind. installation of approx. 700 sq ft of 5/8 type sheetrock.Details
unit #3: kitchen and bathroom remodel in kind. installation of approx. 700 sq ft of 5/8 type sheetrock. | $27,000 |
| Jun 4, 2024 | Completed final sign-off Jun 2025 | 227 Dellbrook Av | install bedroom, bathroom and home office at existing ground floor.Details
install bedroom, bathroom and home office at existing ground floor. | $100,000 |
| Nov 6, 2020 | Never finaled issued Apr 2021, no final | 349 Vicente St | alteration to (e) building. 1st flr - add 1 bathroom, fam room and bedroom. 2nd flr - remodel kitchen, add 1 bathroom. remove deck at lightwellDetails
alteration to (e) building. 1st flr - add 1 bathroom, fam room and bedroom. 2nd flr - remodel kitchen, add 1 bathroom. remove deck at lightwell | $80,000 |
| Nov 12, 2019 | Completed final sign-off Jan 2021 | 2587 35th Av | remodeling extg kitchen and bath room (change tile and fixtures at 2nd floor. install 2 bedrooms and 1 full bathroom at 1st floor.Details
remodeling extg kitchen and bath room (change tile and fixtures at 2nd floor. install 2 bedrooms and 1 full bathroom at 1st floor. | $68,000 |
| Aug 6, 2015 | Never finaled issued Feb 2017, no final | 477 Elizabeth St | addition of new fourth floor, new third floor roof deck; full interior remodel of unit 4; to include (3) bedrooms; (2.5) bath configurationDetails
addition of new fourth floor, new third floor roof deck; full interior remodel of unit 4; to include (3) bedrooms; (2.5) bath configuration | $60,000 |
| Dec 27, 2007 | Never finaled issued Dec 2007, no final | 2160 15th Av | remodel and replace extg kitchen cabinets and top. 2) remodel replace extg master bath tile wall & floorDetails
remodel and replace extg kitchen cabinets and top. 2) remodel replace extg master bath tile wall & floor | $16,000 |
| Apr 19, 2002 | Never finaled issued Mar 2003, no final | 700 Lawton St | construct 2nd floor over exist structure, new kitchen & bath on exist 1st floor.Details
construct 2nd floor over exist structure, new kitchen & bath on exist 1st floor. | $80,000 |