Back to bathroom remodel contractors
Cogent Construction & Consulting Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2010 to Aug 2025
- Last 24 months
- 4 permits filed
54 permits since 2000: 45 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 13 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2025 | Expired or cancelled withdrawn Sep 2025 | 1504 Bryant St | alteration to pa #2021-0820-6871: slight modification to one wall at mech room; add/change walls at hall, add 3 doors at hall wall & windows. lighting layout changed, less lighting installed, add fire extinguishers & emergency exit lights. revise (e) bath slightly to meet ada.Details
alteration to pa #2021-0820-6871: slight modification to one wall at mech room; add/change walls at hall, add 3 doors at hall wall & windows. lighting layout changed, less lighting installed, add fire extinguishers & emergency exit lights. revise (e) bath slightly to meet ada. | $25,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 1785 Alabama St | remodel bathroom.Details
remodel bathroom. | $10,000 |
| Nov 8, 2024 | Completed final sign-off May 2025 | 2178 28th Av | remodel kitchen and bathroom on 2nd fl, upgrade electrical entire house replace furnanceDetails
remodel kitchen and bathroom on 2nd fl, upgrade electrical entire house replace furnance | $50,000 |
| Oct 28, 2024 | Completed final sign-off Jun 2025 | 1547 24th Av | remodel kitchen and master bathroom on 2nd floor in kind. no change to wall layout. no change to floor layout. no structural work.Details
remodel kitchen and master bathroom on 2nd floor in kind. no change to wall layout. no change to floor layout. no structural work. | $20,000 |
| Aug 20, 2021 | Completed final sign-off Sep 2025 | 1504 Bryant St | add storage rooms, renovate extg bath to ada bath, change out/add light fixtures with switches and outlets in storage rooms, ada bath and vacant tenant area.Details
add storage rooms, renovate extg bath to ada bath, change out/add light fixtures with switches and outlets in storage rooms, ada bath and vacant tenant area. | $20,000 |
| May 19, 2021 | Completed final sign-off Sep 2022 | 791 34th Av | remodel one bathroom on 1st floor. replace new tub, sink , and toilet. non structural.Details
remodel one bathroom on 1st floor. replace new tub, sink , and toilet. non structural. | $7,500 |
| Dec 21, 2020 | Completed final sign-off May 2021 | 228 22nd Av | remodel bathroom on 1st floor in kind.Details
remodel bathroom on 1st floor in kind. | $10,000 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 443 Lakeshore Dr | comply w/ complaint 201987491. demo of illegal structure in backyard. no bathroom or illegal unit.Details
comply w/ complaint 201987491. demo of illegal structure in backyard. no bathroom or illegal unit. | $1,500 |
| Jan 11, 2018 | Never finaled issued Jan 2018, no final | 228 22nd Av | 2nd fl: new bathroom and sink.Details
2nd fl: new bathroom and sink. | $12,000 |
| Jan 12, 2017 | Completed final sign-off Jun 2017 | 1810 Hyde St | work is only at unit 1810 & 1812 - kitchen & bathrooms remodel in kind; update elctrical for both units. n/a maher ord. 155-13Details
work is only at unit 1810 & 1812 - kitchen & bathrooms remodel in kind; update elctrical for both units. n/a maher ord. 155-13 | $40,000 |
| Nov 4, 2016 | Completed final sign-off Mar 2017 | 167 Beverly St | add two bedrooms, one full bath, relocate washer & dryer at first floor per plan.Details
add two bedrooms, one full bath, relocate washer & dryer at first floor per plan. | $39,600 |
| Sep 21, 2015 | Completed final sign-off Oct 2016 | 2527 33rd Av | remodel projects, including legalization of an (e) ground floor room; a new ground floor bath & closet; a new exit through the garage; remodel of a kitchen and bathroom at 2nd floorDetails
remodel projects, including legalization of an (e) ground floor room; a new ground floor bath & closet; a new exit through the garage; remodel of a kitchen and bathroom at 2nd floor | $70,000 |
| Sep 3, 2015 | Completed final sign-off Mar 2016 | 115 Lawton St | convert (e) portion of garage to: 1 family room, 1 bedroom and 1 bathroom. replace 2 windows at rear and install (1) new window. 2nd flr: remodel kitchen & bathroom in kind. update elect & plumb per code.Details
convert (e) portion of garage to: 1 family room, 1 bedroom and 1 bathroom. replace 2 windows at rear and install (1) new window. 2nd flr: remodel kitchen & bathroom in kind. update elect & plumb per code. | $60,000 |
| Jun 29, 2015 | Completed final sign-off Sep 2015 | 2234 27th Av | remodel (e) bathroom on 1st floor. electrical and plumbing upgrade.Details
remodel (e) bathroom on 1st floor. electrical and plumbing upgrade. | |
| May 31, 2013 | Completed final sign-off Aug 2013 | 128 Lisbon St | repair due to fire damage at back part of building per building inspection and correction notice dated 3-21-13. remodel kitchen and bath. all repair in kind. update electric and plumbingDetails
repair due to fire damage at back part of building per building inspection and correction notice dated 3-21-13. remodel kitchen and bath. all repair in kind. update electric and plumbing | $35,000 |
| Sep 20, 2012 | Completed final sign-off Jan 2013 | 1667 33rd Av | remodel (e) bathroom. update electrical and plumbing. replace all fixtures. no change on walls.Details
remodel (e) bathroom. update electrical and plumbing. replace all fixtures. no change on walls. | $6,500 |