Coastwide Electric
- Based in
- Morgan Hill
- On San Francisco permits
- Mar 2026 to Mar 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 1546 Noe St | solar permit: installing 10 solar pv modules, 440 watts per module, total no. of rating 4.4 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 9 kwh each in capacity, ess units will not be closer than 3 feet | 4.4 kw roof mounted solar, 15 kwh enerDetails
solar permit: installing 10 solar pv modules, 440 watts per module, total no. of rating 4.4 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 9 kwh each in capacity, ess units will not be closer than 3 feet | 4.4 kw roof mounted solar, 15 kwh ener | $28,500 |