Back to bathroom remodel contractors
Cma Development Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2019 to Aug 2026
- Last 24 months
- 19 permits filed
32 permits since 2000: 19 completed, 7 in progress, 6 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 2 completed, 3 in progress. Typically 72 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2026 | In progress issued Mar 2026 | 1501 Diamond St | convert an existing powder room to a full bath and add a new laundryDetails
convert an existing powder room to a full bath and add a new laundry | $10,000 |
| Feb 9, 2026 | In progress issued Sep 2026 | 687 12th Av | add (n) balcony at (e) sunroom and perform interior renmovation within (e) residence to include 3.5x bathroom and kitchen remodel .Details
add (n) balcony at (e) sunroom and perform interior renmovation within (e) residence to include 3.5x bathroom and kitchen remodel . | $200,000 |
| Jan 1, 2026 | In progress issued May 2026 | 81 Manchester St | level 1:adu convertion per state prgm include: partition for separate entrance from garage.level 2: replace siding @ street & backyard facade & replace window @ street facade in kind.removal (e) fireplace. (n) en-suite bathrm & closet in master bedrm.reconfiguration of existing bathroom and laundryDetails
level 1:adu convertion per state prgm include: partition for separate entrance from garage.level 2: replace siding @ street & backyard facade & replace window @ street facade in kind.removal (e) fireplace. (n) en-suite bathrm & closet in master bedrm.reconfiguration of existing bathroom and laundry | $180,000 |
| Jun 6, 2025 | Completed final sign-off Aug 2025 | 227 Fair Oaks St | rear building: in kind 5x8 bathroom remodel. remove (e) tub and replace shower. replace toilet, vanity. all work is in the rear.Details
rear building: in kind 5x8 bathroom remodel. remove (e) tub and replace shower. replace toilet, vanity. all work is in the rear. | $20,000 |
| Jun 1, 2021 | Completed final sign-off Feb 2022 | 78 Malta Dr | full kitchen remodel to include demo & replacement of all (e) cabinet fixtures, appliances. full remodel of 2 f full & 1 half bath. (n) gas fireplace (n) 42"h glass guardrail @ entry stair (n) interior doorsDetails
full kitchen remodel to include demo & replacement of all (e) cabinet fixtures, appliances. full remodel of 2 f full & 1 half bath. (n) gas fireplace (n) 42"h glass guardrail @ entry stair (n) interior doors | $50,000 |