Cloud Mechanical Heating & Air Condition
- Based in
- San Mateo
- On San Francisco permits
- Nov 2009 to Nov 2009
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 23, 2009 | Completed final sign-off Apr 2010 | 273 28th St | two new type b gav vent from basement to roof, two new furnaces btu 70,000, two new water heatewr btu 40,000, two dryer vent, teo bathroom ducts & new ducts to (e) locationDetails
two new type b gav vent from basement to roof, two new furnaces btu 70,000, two new water heatewr btu 40,000, two dryer vent, teo bathroom ducts & new ducts to (e) location | $12,000 |