Back to bathroom remodel contractors
Clipper Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Aug 2026
- Last 24 months
- 10 permits filed
84 permits since 2000: 59 completed, 3 in progress, 8 never finaled, 14 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 13 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2026 | Expired or cancelled cancelled May 2026 | 151 Dolores St | unit# 5: remodel kitchen- cabinets, countertops, appliances in kind. remodel bathroom- stall shower, vanity, toilet in kind. upgrade electrical subpanel.Details
unit# 5: remodel kitchen- cabinets, countertops, appliances in kind. remodel bathroom- stall shower, vanity, toilet in kind. upgrade electrical subpanel. | $50,000 |
| Nov 26, 2025 | Completed final sign-off Dec 2025 | 184 Locksley Av | unit #4: bath remodel. replace tub. replace tub surround.Details
unit #4: bath remodel. replace tub. replace tub surround. | $14,000 |
| Mar 26, 2025 | In progress issued Mar 2025 | 677 Clementina St | to abate nov 202316808 items 2,4,5,7,8,9 includes kitchen replace cabinets appliances fixtures in kind with (n) lighting. no wall/ceiling demo. bathroom replace fixtures and vanity in kind with (n) lighting. no wall/ceiling demo.Details
to abate nov 202316808 items 2,4,5,7,8,9 includes kitchen replace cabinets appliances fixtures in kind with (n) lighting. no wall/ceiling demo. bathroom replace fixtures and vanity in kind with (n) lighting. no wall/ceiling demo. | $30,000 |
| Sep 6, 2023 | Completed final sign-off Mar 2024 | 61 Walter St | remodel kitchen & bath.Details
remodel kitchen & bath. | $50,000 |
| Feb 11, 2021 | Completed final sign-off Nov 2021 | 133 Steiner St | new floor finishes throughout. new base and trim throughout, new cabinetry troughout. new interior doors and hardwarde throughout. new paint. no work at kitchen and bathDetails
new floor finishes throughout. new base and trim throughout, new cabinetry troughout. new interior doors and hardwarde throughout. new paint. no work at kitchen and bath | $8,000 |
| Feb 25, 2020 | Completed final sign-off Jul 2020 | 1800 Washington St | kitchen and bathroom remodel. remodel in kind.Details
kitchen and bathroom remodel. remodel in kind. | $40,000 |
| Feb 14, 2019 | Completed final sign-off Jun 2019 | 4048 21st St | remodel bathroom change fixtures, re-tile shower. bath 6x8 provide vacany sensor in bathroom. add lighting to living room ceiling. all to be h.e.Details
remodel bathroom change fixtures, re-tile shower. bath 6x8 provide vacany sensor in bathroom. add lighting to living room ceiling. all to be h.e. | $40,000 |
| Jan 31, 2019 | Completed final sign-off May 2019 | 1795 Haight St | install ada bathroom at gr fl commercial space in kindDetails
install ada bathroom at gr fl commercial space in kind | $20,000 |
| Jul 12, 2018 | Completed final sign-off Nov 2018 | 228 Dellbrook Av | renovation of ground floor rooms, add new bathroom, upgrade lighting and electrical. legalize home office.Details
renovation of ground floor rooms, add new bathroom, upgrade lighting and electrical. legalize home office. | $120,000 |
| Jan 4, 2018 | Expired or cancelled cancelled Jan 2026 | 350 Steiner St | adding art studio in an area that was previously unconditioned garage space. remodel/enlarge (e) bathroom. convert (e) bedroom to officeDetails
adding art studio in an area that was previously unconditioned garage space. remodel/enlarge (e) bathroom. convert (e) bedroom to office | $120,000 |
| Mar 16, 2016 | Completed final sign-off Aug 2016 | 447 Corbett Av | replace cabinetsm fixtures, and appliances in kitchen and bath. upgrade elect. subpanel & lighting. no alteration of wall, window and door.Details
replace cabinetsm fixtures, and appliances in kitchen and bath. upgrade elect. subpanel & lighting. no alteration of wall, window and door. | $40,000 |
| May 24, 2013 | Completed final sign-off Jul 2014 | 2311 California St | revision to permit 201205291413; remodel one bathroom, upgrade of fixtures and tile workDetails
revision to permit 201205291413; remodel one bathroom, upgrade of fixtures and tile work | $10,000 |
| Jun 14, 2011 | Completed final sign-off Oct 2011 | 538 Utah St | replace rotten bathroom drains at rear. upgrade electrical in 2 top floor bedrooms. insulate top floor walls and ceiling and install new sheetrock. insulation in walls and ceilings to be r-13 and r-19.Details
replace rotten bathroom drains at rear. upgrade electrical in 2 top floor bedrooms. insulate top floor walls and ceiling and install new sheetrock. insulation in walls and ceilings to be r-13 and r-19. | $25,000 |
| Jan 15, 2010 | Completed final sign-off Sep 2011 | 639 14th St | 3rd floor: enlarge landing off rear kitchen door, bathroom remodel,enlarge opening at dining/living/kitchen, kitchen remodel, recessed lighting, skylightsDetails
3rd floor: enlarge landing off rear kitchen door, bathroom remodel,enlarge opening at dining/living/kitchen, kitchen remodel, recessed lighting, skylights | $40,000 |
| Aug 7, 2006 | Completed final sign-off Jun 2007 | 157 Noe St | remodel kitchen & bathroom in unit 159 only. repair plaster walls, remove partition as shown.Details
remodel kitchen & bathroom in unit 159 only. repair plaster walls, remove partition as shown. | $110,000 |
| Dec 10, 2004 | Completed final sign-off Apr 2005 | 147 Graystone Tr | add half bathDetails
add half bath | $10,000 |