Back to bathroom remodel contractors
Cliff Point Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2024 to Oct 2026
- Last 24 months
- 18 permits filed
20 permits since 2000: 14 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 in progress. Typically 0 days from filing to permit and 327 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2026 | In progress issued Mar 2026 | 34 Presidio Tr | 2 bathroom remodels like for like, install new cabinets in gym room, replace hallway ceiling lights, no structual work. no removal of wallsDetails
2 bathroom remodels like for like, install new cabinets in gym room, replace hallway ceiling lights, no structual work. no removal of walls | $89,519 |
| Jan 16, 2026 | Completed final sign-off Apr 2026 | 2768 Green St | 7 window replacements, in-kind. two door replacements in-kind. countertop/vanity in bathroom replacement. (1) window is street visible.Details
7 window replacements, in-kind. two door replacements in-kind. countertop/vanity in bathroom replacement. (1) window is street visible. | $3,100 |
| Aug 29, 2025 | Completed final sign-off Sep 2026 | 651 29th Av | kitchen remodel. add island, bring up to code, open wall between living room & kitchen, add laundry nook, 3 bath remodel. 2nd fl: one bathroom added, all low flow fixtures, add sliding door on 1st fl. add led lights in rooms. bring electrical to code, install heat pump, repair & replace plumbingDetails
kitchen remodel. add island, bring up to code, open wall between living room & kitchen, add laundry nook, 3 bath remodel. 2nd fl: one bathroom added, all low flow fixtures, add sliding door on 1st fl. add led lights in rooms. bring electrical to code, install heat pump, repair & replace plumbing | $56,730 |
| Jun 24, 2025 | Completed final sign-off Feb 2026 | 1419 20th St | bathroom remodel to existing bathroom, replace fixtures with low flow fixtures, add bathroom fan, add gfci, bring exting bathroom to code. new tile. no removal of wallsDetails
bathroom remodel to existing bathroom, replace fixtures with low flow fixtures, add bathroom fan, add gfci, bring exting bathroom to code. new tile. no removal of walls | $15,000 |
| Apr 23, 2025 | Completed final sign-off Mar 2026 | 34 Presidio Tr | upper level, northwest bathroom - bathroom remodel. in kind, (n) finishes, no structural or exterior work.Details
upper level, northwest bathroom - bathroom remodel. in kind, (n) finishes, no structural or exterior work. | $32,012 |
| Apr 7, 2025 | Completed final sign-off Mar 2026 | 34 Presidio Tr | remodel 3 bathrooms and 1 laundry room. no structural or exterior. remodel in-kind.Details
remodel 3 bathrooms and 1 laundry room. no structural or exterior. remodel in-kind. | $98,519 |
| Jan 27, 2025 | In progress issued Jan 2025 | 4150 17th St | remodel of kitchen add built in seatery, remodel main floor bath nw single vanity , replace shower plumbing, new toilet con flush new tile, new closet, remodele main bath new tub new plumbing and fixtures new tile new to code kitchen electricalDetails
remodel of kitchen add built in seatery, remodel main floor bath nw single vanity , replace shower plumbing, new toilet con flush new tile, new closet, remodele main bath new tub new plumbing and fixtures new tile new to code kitchen electrical | $56,000 |