Back to bathroom remodel contractors
Clearpath Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Oct 2017
- Last 24 months
- 0 permits filed
20 permits since 2000: 13 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 5 completed, 4 never finaled. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 27, 2017 | Never finaled issued Jan 2017, no final | 139 Lake Merced Hill St South St | new header to widen opening in bearing wall. remodel of kitchen and 2 bathrooms in unit 3 without alteration of wall, window, door and fixture.Details
new header to widen opening in bearing wall. remodel of kitchen and 2 bathrooms in unit 3 without alteration of wall, window, door and fixture. | $5,000 |
| Jul 18, 2016 | Completed final sign-off Jul 2017 | 236 Lake Merced Hill No Bl | bathroom remodel: re-tile, new shower pan, replace vanity, new fan, new shower valve and heads.Details
bathroom remodel: re-tile, new shower pan, replace vanity, new fan, new shower valve and heads. | $16,000 |
| Oct 23, 2014 | Never finaled issued Oct 2014, no final | 73 Sumner St | work in unit 205: bathroom remodel, new tile, new shower, new toilet. all in same place.Details
work in unit 205: bathroom remodel, new tile, new shower, new toilet. all in same place. | $11,500 |
| Aug 1, 2013 | Completed final sign-off Dec 2013 | 160 Boutwell St | to comply with nov #201274122/201274521. remove kitchen cabinets, sink, table (i.e. any existence of illegal kitchen), remove tub in bathroom or reinstall door at bathroom. add sheetrock where damaged or missing per owner.Details
to comply with nov #201274122/201274521. remove kitchen cabinets, sink, table (i.e. any existence of illegal kitchen), remove tub in bathroom or reinstall door at bathroom. add sheetrock where damaged or missing per owner. | $3,800 |
| Jan 14, 2013 | Never finaled issued Jan 2013, no final | 312 Liberty St | remodel basement unit. remodel kitchen & bath. move bearing wall @ crawl space & replace footings. remove/reconfig. windows & doors with nw insulated windows & doors. 1 nw skylight (replace) nw electrical nw hydronic heat system. nw laundry closet. replace deck & railg nw fire rated @ side lot linsDetails
remodel basement unit. remodel kitchen & bath. move bearing wall @ crawl space & replace footings. remove/reconfig. windows & doors with nw insulated windows & doors. 1 nw skylight (replace) nw electrical nw hydronic heat system. nw laundry closet. replace deck & railg nw fire rated @ side lot lins | $40,000 |
| Nov 20, 2012 | Never finaled issued Nov 2012, no final | 314 Liberty St | demo cabinets and some sheetrock in lower unit bathroom & kitchen.Details
demo cabinets and some sheetrock in lower unit bathroom & kitchen. | $1,500 |
| Jun 11, 2012 | Completed final sign-off Feb 2013 | 168 Grattan St | new kitchen cabinets, new tile in bathroom, opening of doorways between living room and dining room. hardwood floorsDetails
new kitchen cabinets, new tile in bathroom, opening of doorways between living room and dining room. hardwood floors | $18,000 |
| Jan 10, 2012 | Completed final sign-off Feb 2012 | 208 Lake Merced Bl | #2e - re-tile bathroom walls & floor, replace vanities, base boards, paint entire condo.Details
#2e - re-tile bathroom walls & floor, replace vanities, base boards, paint entire condo. | $8,500 |
| Jun 14, 2010 | Completed final sign-off Jul 2010 | 412 Broderick St | work in unit #416-repair sheetrock in bathroom, repair floor in bathroom & deck repairs less than 50%, no moving or adding wallsDetails
work in unit #416-repair sheetrock in bathroom, repair floor in bathroom & deck repairs less than 50%, no moving or adding walls | $2,200 |