Back to bathroom remodel contractors
Citywest Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Jun 2026
- Last 24 months
- 18 permits filed
144 permits since 2000: 108 completed, 13 in progress, 14 never finaled, 9 expired or cancelled.
Of the 14 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
47 bathroom remodel permits: 36 completed, 4 in progress, 4 never finaled, 3 expired or cancelled. Typically 15 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Jun 2026 | 3641 Clement St | interior remodel. reconfigure level 2 kitchen and dinig area. update bedrooms, bathroom, add bathroom on level 3.Details
interior remodel. reconfigure level 2 kitchen and dinig area. update bedrooms, bathroom, add bathroom on level 3. | $161,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 1073 Filbert St | reivison to pa#202503263093: infill of (e) lightwell on 2/f and interior remodel of (e) bathroom to include (n) partition, doors, ceilings, lighting and plumbing fixture. work includes structural framing revisions at 4/f due to existing conditions discovered during construction. no proposed work atDetails
reivison to pa#202503263093: infill of (e) lightwell on 2/f and interior remodel of (e) bathroom to include (n) partition, doors, ceilings, lighting and plumbing fixture. work includes structural framing revisions at 4/f due to existing conditions discovered during construction. no proposed work at | $25,136 |
| Jun 18, 2025 | Completed final sign-off Jan 2026 | 166 10th Av | unit3; reconfigure and remodel (1) bedroom, (2) bathrooms and the kitchen of unit 3. add (3) new skylights - min 60" from the property line parapets.Details
unit3; reconfigure and remodel (1) bedroom, (2) bathrooms and the kitchen of unit 3. add (3) new skylights - min 60" from the property line parapets. | $72,800 |
| Jun 3, 2025 | Completed final sign-off Jan 2026 | 166 10th Av | apt 3: kitchen and two bathrooms remodel. all in-kind. no structural work.Details
apt 3: kitchen and two bathrooms remodel. all in-kind. no structural work. | $50,000 |
| May 23, 2025 | In progress issued Oct 2025 | 1073 Filbert St | interior remodel of upper unit to include infill of (e) light well, remodeled kitchen, dining room, guest bathroom, primary suite and den. new interior finishes, partitions, doors, ceilings, lighting and plumbing fixtures throughout upper unit. exterior work: window replacement at 2nd & 3rd fl.Details
interior remodel of upper unit to include infill of (e) light well, remodeled kitchen, dining room, guest bathroom, primary suite and den. new interior finishes, partitions, doors, ceilings, lighting and plumbing fixtures throughout upper unit. exterior work: window replacement at 2nd & 3rd fl. | $600,000 |
| Jan 23, 2025 | Completed final sign-off Nov 2025 | 877 Carolina St | level 1: remodel (e) bathroom/closet into (n) steam room and sauna level 2: add pocket door in media room no structural workDetails
level 1: remodel (e) bathroom/closet into (n) steam room and sauna level 2: add pocket door in media room no structural work | $13,500 |
| Dec 13, 2024 | Completed final sign-off Apr 2025 | 196 Valley St | unit a: kitchen and bathroom remodel, new insulation and sheetrock and trim at bedroom and living room.Details
unit a: kitchen and bathroom remodel, new insulation and sheetrock and trim at bedroom and living room. | $70,000 |
| Oct 2, 2024 | Completed final sign-off Mar 2025 | 155 Eureka St | unit# 4: kitchen, bathroom and laundry room remodel, like for like.Details
unit# 4: kitchen, bathroom and laundry room remodel, like for like. | $35,000 |
| Aug 21, 2024 | In progress issued Jan 2025 | 10 Seacliff Av | revision to pa202206216738.update at basement,horiz expansion at the basement by upto 8'vert excav,lowering mat slab south of grid line 5, adjusting windows sizes/location, adding bed,bath.laundry and fitness&reaaranging remaining rooms.1/f:remove pocket door.earth shoring associated with both pasDetails
revision to pa202206216738.update at basement,horiz expansion at the basement by upto 8'vert excav,lowering mat slab south of grid line 5, adjusting windows sizes/location, adding bed,bath.laundry and fitness&reaaranging remaining rooms.1/f:remove pocket door.earth shoring associated with both pas | $150,000 |
| Mar 6, 2024 | Completed final sign-off Dec 2024 | 2164 Hyde St | unit 202: interior remodel of (2) existing bathrooms, (2) closets and wet bar. new and enlarged openings at non-load bearing wallsDetails
unit 202: interior remodel of (2) existing bathrooms, (2) closets and wet bar. new and enlarged openings at non-load bearing walls | $100,000 |
| Aug 23, 2023 | Completed final sign-off Feb 2025 | 120 Commonwealth Av | conversion & renovation of (e) detached garage into an adu. new windows, new ext steps & frt porch, new ext finishes & lighting throughout. int work incl modification & infill (e) int walls, adding raised fl sys, new int partitions, doors, ceilings, & lighting. new kitchen, bathroom, & living spaceDetails
conversion & renovation of (e) detached garage into an adu. new windows, new ext steps & frt porch, new ext finishes & lighting throughout. int work incl modification & infill (e) int walls, adding raised fl sys, new int partitions, doors, ceilings, & lighting. new kitchen, bathroom, & living space | $105,417 |
| Apr 26, 2023 | Completed final sign-off Jun 2024 | 730 Fillmore St | 2nd fl renovation; remodel e kitchen and bath. 1st fl renovation: remodel mdroom and relocate e utilities and washer dryerDetails
2nd fl renovation; remodel e kitchen and bath. 1st fl renovation: remodel mdroom and relocate e utilities and washer dryer | $75,000 |
| May 3, 2022 | Completed final sign-off Sep 2022 | 1526 Mcallister St | renovation of (e) split bathroom, all plumbing fixtures to remain in the same location. new shower in (e) half bath, no exterior work. all work on 3rd flrDetails
renovation of (e) split bathroom, all plumbing fixtures to remain in the same location. new shower in (e) half bath, no exterior work. all work on 3rd flr | $40,000 |
| Jan 27, 2022 | Completed final sign-off Sep 2022 | 550 04th Av | 3 fl; remove (e) powder room; remodel (e) full bath; add (n) full bathrm to master bedroom; no removal of structural wallsDetails
3 fl; remove (e) powder room; remodel (e) full bath; add (n) full bathrm to master bedroom; no removal of structural walls | $60,000 |
| Mar 9, 2021 | Expired or cancelled cancelled Jan 2024 | 2850 Filbert St | remodel of master bathroom - in kind , one unit only.Details
remodel of master bathroom - in kind , one unit only. | $45,000 |
| Feb 12, 2020 | Completed final sign-off Feb 2020 | 268 02nd Av | admin permit only to revise pa#202002073901. construction cost to kithcen & bath remodel. total square footage.Details
admin permit only to revise pa#202002073901. construction cost to kithcen & bath remodel. total square footage. | $21,365 |
| Feb 7, 2020 | Completed final sign-off Feb 2020 | 268 02nd Av | replace finishes to replace (e) plumbing fixtures. minor electrical to kitchen and bathDetails
replace finishes to replace (e) plumbing fixtures. minor electrical to kitchen and bath | |
| Dec 20, 2019 | Completed final sign-off Jun 2022 | 3846 25th St | interior remodel & some reconfiguration. kitchen and bath renovation. replace one window w/ door on leve l1 . add one bathroom on level 3. new windows at door entryDetails
interior remodel & some reconfiguration. kitchen and bath renovation. replace one window w/ door on leve l1 . add one bathroom on level 3. new windows at door entry | $250,000 |
| Sep 11, 2019 | Never finaled issued Oct 2019, no final | 1135 Clayton St | no exterior work other than grading and landscaping. 1st level - minor layout adjustments . 2nd flr - relocate & enlarge bath, enlarge window. 3rd level - enlarge (e) kitchen and remove portions of interior walls. no work on front facade, patch siding at rear as neededDetails
no exterior work other than grading and landscaping. 1st level - minor layout adjustments . 2nd flr - relocate & enlarge bath, enlarge window. 3rd level - enlarge (e) kitchen and remove portions of interior walls. no work on front facade, patch siding at rear as needed | $50,000 |
| Dec 26, 2018 | Completed final sign-off Aug 2020 | 435 Marina Bl | revision to app#201511061988 3rd floor: revise master suite adjust location of master bath and closets, remove window from bedroom closet. reconf. remove note to aded 30" parapet retain note to fire rate entire span roof framing, 1 hr fire rated.facade enlarge master bedroom dorr, remove window.Details
revision to app#201511061988 3rd floor: revise master suite adjust location of master bath and closets, remove window from bedroom closet. reconf. remove note to aded 30" parapet retain note to fire rate entire span roof framing, 1 hr fire rated.facade enlarge master bedroom dorr, remove window. | |
| Dec 10, 2018 | Completed final sign-off Feb 2024 | 611 El Camino Del Mar | remodel including enlarged & excavated basement, kitchen remodel, interior infill on 2nd flr, re-configeration of bedrooms & bathrooms on 2nd flr, (n) interior stair, (n) patio, (n) windows & doors. **comply with maher ord 155-13, route to dph**Details
remodel including enlarged & excavated basement, kitchen remodel, interior infill on 2nd flr, re-configeration of bedrooms & bathrooms on 2nd flr, (n) interior stair, (n) patio, (n) windows & doors. **comply with maher ord 155-13, route to dph** | $1,600,000 |
| Oct 23, 2018 | Never finaled issued Jan 2019, no final | 2320 Union St | new roof deck on level 3 and level 4. infill at lower level south lightwell. interior reconfiguration of unit1&2 on all levels new bathroom, bedroom & media room on level 1, move garage door to be recessed from front 1'-6"Details
new roof deck on level 3 and level 4. infill at lower level south lightwell. interior reconfiguration of unit1&2 on all levels new bathroom, bedroom & media room on level 1, move garage door to be recessed from front 1'-6" | $350,000 |
| Jun 7, 2018 | Completed final sign-off Apr 2022 | 3645 Scott St | adding 1.5 baths,two level vertical addition above (e) two level residence. new interior walls, doors, ceilings, lights, fixtures & finishes. exterior work to include new finishes, doors & windows. project includes rear patio @ 2nd fl and a roof deck on 4th fl. fully sprinkler n.f.p.a 13rDetails
adding 1.5 baths,two level vertical addition above (e) two level residence. new interior walls, doors, ceilings, lights, fixtures & finishes. exterior work to include new finishes, doors & windows. project includes rear patio @ 2nd fl and a roof deck on 4th fl. fully sprinkler n.f.p.a 13r | $760,913 |
| Mar 13, 2018 | Never finaled issued Mar 2021, no final | 2440 Filbert St | vertical & horizontal expansion. facade - restucco, replace windows in kind. 2nd floor deck. 3rd floor roof deck. new interior layout @ all levels. 2 new bedrooms & 3 new baths. new plumbing & electrical. nfpa 13r, sprinklers under seperate permit.Details
vertical & horizontal expansion. facade - restucco, replace windows in kind. 2nd floor deck. 3rd floor roof deck. new interior layout @ all levels. 2 new bedrooms & 3 new baths. new plumbing & electrical. nfpa 13r, sprinklers under seperate permit. | $800,000 |
| Mar 9, 2017 | Never finaled issued Feb 2022, no final | 156 27th Av | vertical addition from 31"-6" to 35"-0" & horizontal expansion. reconfigure of all floors including (e)bathroom & (e)kitchenDetails
vertical addition from 31"-6" to 35"-0" & horizontal expansion. reconfigure of all floors including (e)bathroom & (e)kitchen | $195,000 |
| Aug 4, 2016 | Completed final sign-off Mar 2018 | 574 Dellbrook Av | infill at rear under cantilevered portion of 2nd level, enlarge window at front facade, remodel of upper level bathroom, reconfiguration of lower level to convert poart of garage into habitable space.Details
infill at rear under cantilevered portion of 2nd level, enlarge window at front facade, remodel of upper level bathroom, reconfiguration of lower level to convert poart of garage into habitable space. | $30,000 |
| Jul 11, 2016 | Completed final sign-off Nov 2016 | 3878 Clay St | interior renovations of 1 residential unit at 2nd flr. replace bathr fixtures in full and half bath. add new full bath relocate w/dDetails
interior renovations of 1 residential unit at 2nd flr. replace bathr fixtures in full and half bath. add new full bath relocate w/d | $65,000 |
| Apr 20, 2016 | Completed final sign-off May 2016 | 145 22nd Av | ceiling repair due to water damage, approx 60 sq. ft.; retile bathroom floor; refinish hardwood floorsDetails
ceiling repair due to water damage, approx 60 sq. ft.; retile bathroom floor; refinish hardwood floors | $1,000 |
| Apr 12, 2016 | Completed final sign-off Oct 2016 | 2226 Filbert St | revivion to ref pa 2016 0301 0859: interior remodel of flat - removal of a non load bearing partition wall. cosmetic upgrades to the w/c bathroom and litchen. new finiish flooring, doors and lighting throughout. new skylight. replace (e) kitchen window - change in size - at rear, no new sq footageDetails
revivion to ref pa 2016 0301 0859: interior remodel of flat - removal of a non load bearing partition wall. cosmetic upgrades to the w/c bathroom and litchen. new finiish flooring, doors and lighting throughout. new skylight. replace (e) kitchen window - change in size - at rear, no new sq footage | $5,000 |
| Mar 1, 2016 | Completed final sign-off Oct 2016 | 2226 Filbert St | interior remodel of a flat, removal of a non-load bearing partition wall, cosmetic upgrades to the water closet, bathroom and kitchen. addition of a powder room off the kitchen, new finishes flooring, doors, and lighting throughout. no exterior work to be performed. no new square footage added.Details
interior remodel of a flat, removal of a non-load bearing partition wall, cosmetic upgrades to the water closet, bathroom and kitchen. addition of a powder room off the kitchen, new finishes flooring, doors, and lighting throughout. no exterior work to be performed. no new square footage added. | $20,000 |
| Nov 6, 2015 | Completed final sign-off Aug 2020 | 435 Marina Bl | ~encrypt&horizontal & vertical addition of 1 story & roof deck. new interior layout, new electrical, new plumbing, finish part of garage level into conditioned space, addition of bedrooms & bathrooms. n/a for maher ordinance no.155-13.Details
~encrypt&horizontal & vertical addition of 1 story & roof deck. new interior layout, new electrical, new plumbing, finish part of garage level into conditioned space, addition of bedrooms & bathrooms. n/a for maher ordinance no.155-13. | $249,000 |
| May 27, 2015 | Completed final sign-off Dec 2018 | 2154 36th Av | 1st floor, 2nd floor horizontal expansion to include sunroom on 1st floor & bathroom & facade, window railing on 2nd floor. 3rd floor addition to include 2 new bathrooms, new office & new bedroom.Details
1st floor, 2nd floor horizontal expansion to include sunroom on 1st floor & bathroom & facade, window railing on 2nd floor. 3rd floor addition to include 2 new bathrooms, new office & new bedroom. | $75,000 |
| May 22, 2015 | Expired or cancelled cancelled Aug 2017 | 585 Marina Bl | revision to 2015 0213 8313 - interior remodel of lower level including the addition of 2 bathrooms & laundry room. new landscape & patio in rear. sprinkler under separate permit. maher naDetails
revision to 2015 0213 8313 - interior remodel of lower level including the addition of 2 bathrooms & laundry room. new landscape & patio in rear. sprinkler under separate permit. maher na | $20,000 |
| Jan 15, 2015 | Completed final sign-off Oct 2015 | 2154 36th Av | reconfiguration of interior spaces. infill of interior court yard and lightwell. new kitchen and bathroomDetails
reconfiguration of interior spaces. infill of interior court yard and lightwell. new kitchen and bathroom | $75,000 |
| Aug 19, 2014 | Completed final sign-off Oct 2015 | 40 Sea View Tr | remodel lower level: lowering the lounge area by 1'-0". adding a wine cellar and a storage room and playroom per plan. remodel upper level: to remove one bedroom, add/relocate bathrooms, remove walls and layout per plan. add 7 skylights.Details
remodel lower level: lowering the lounge area by 1'-0". adding a wine cellar and a storage room and playroom per plan. remodel upper level: to remove one bedroom, add/relocate bathrooms, remove walls and layout per plan. add 7 skylights. | $125,000 |
| May 8, 2014 | Completed final sign-off Aug 2014 | 1469 Dolores St | kitchen, full bath, 1/2 bath remodel. no changein wallsDetails
kitchen, full bath, 1/2 bath remodel. no changein walls | $20,000 |
| Apr 14, 2014 | Completed final sign-off Jun 2018 | 1372 Francisco St | (add 3rd floor: 1 bedroom/1 bathroom); rear horizontal expansion, kitchen and bathrooms remodel, interior layout reconfiguration, new electrical and new plumbingDetails
(add 3rd floor: 1 bedroom/1 bathroom); rear horizontal expansion, kitchen and bathrooms remodel, interior layout reconfiguration, new electrical and new plumbing | $195,000 |
| Mar 25, 2014 | Completed final sign-off Jun 2014 | 663 21st Av | remodel ktichen and bath; to comply with cec150(k).install new insulation/sheetrock/cabinets. toilets etc.Details
remodel ktichen and bath; to comply with cec150(k).install new insulation/sheetrock/cabinets. toilets etc. | $19,000 |
| May 22, 2013 | Completed final sign-off Oct 2013 | 2845 Baker St | interior remodle of kitchen, bathroom, & internal private stair.Details
interior remodle of kitchen, bathroom, & internal private stair. | $25,000 |
| May 16, 2013 | Completed final sign-off Oct 2014 | 2735 Baker St | revision to p/a201110277765. addendum approved reconfigure ground level bath + kitchen. claim ground level lightwell (see neighbor letter. enlarge 2nd level rear faming @ terrace. keep original side lot line wall @ south rear (was a solid railing w/glass on top) enlarge 3rd level master bedroomDetails
revision to p/a201110277765. addendum approved reconfigure ground level bath + kitchen. claim ground level lightwell (see neighbor letter. enlarge 2nd level rear faming @ terrace. keep original side lot line wall @ south rear (was a solid railing w/glass on top) enlarge 3rd level master bedroom | $5,000 |
| Mar 28, 2013 | Expired or cancelled expired Feb 2015 | 2 Montalvo Av | remodel two (2) bathrooms, new plumbing, electrical, sheetrock, insulation, tiles, plumbing fixtures, etc. no change on walls.Details
remodel two (2) bathrooms, new plumbing, electrical, sheetrock, insulation, tiles, plumbing fixtures, etc. no change on walls. | $12,000 |
| Nov 20, 2012 | Completed final sign-off Nov 2013 | 4047 26th St | new aluminum clad windows, sheetrock, insulation, upgrade plumbing & electrical, remodel (e) kitchen and bathroom. no structural work.Details
new aluminum clad windows, sheetrock, insulation, upgrade plumbing & electrical, remodel (e) kitchen and bathroom. no structural work. | $30,000 |
| May 3, 2012 | Completed final sign-off Mar 2013 | 3300 Washington St | excavate basement for new bedrm, bath,media & closets and mech. rm. 2 new window wells at washington st side, replace all window with insul. wood window,1 new hydronic heat system and replace old radiant system. new stair from basemt up. reconfigure kitchen and add home office @ entry lvlDetails
excavate basement for new bedrm, bath,media & closets and mech. rm. 2 new window wells at washington st side, replace all window with insul. wood window,1 new hydronic heat system and replace old radiant system. new stair from basemt up. reconfigure kitchen and add home office @ entry lvl | $100,000 |
| Nov 18, 2011 | Completed final sign-off Jan 2012 | 282 Eureka St | bathroom remodel, approx 70 sq.ft. no structural work.Details
bathroom remodel, approx 70 sq.ft. no structural work. | $9,000 |
| Aug 31, 2011 | Completed final sign-off Oct 2011 | 2235 Turk Bl | bathroom remodel at rear, approx 100 sq.ft.Details
bathroom remodel at rear, approx 100 sq.ft. | $9,000 |
| Aug 8, 2011 | Completed final sign-off Oct 2011 | 3 03rd Av | remodel (2) bathrooms, kitchen and laundry room, no structural work. no doors, walls, windows under this permit. co alarms shall comply with coc, 2010, 420.1.Details
remodel (2) bathrooms, kitchen and laundry room, no structural work. no doors, walls, windows under this permit. co alarms shall comply with coc, 2010, 420.1. | $25,000 |
| Oct 27, 2010 | Completed final sign-off Jul 2011 | 1 Marne Av | new addition of approx. 410 sqft of livable space of master bedrm, full bath, wine rm and a laundry on 1st/garage fl. repair (e) front deck, small remodelling at entry porch and grg/storage area.Details
new addition of approx. 410 sqft of livable space of master bedrm, full bath, wine rm and a laundry on 1st/garage fl. repair (e) front deck, small remodelling at entry porch and grg/storage area. | $64,000 |