Citybest Construction
- Based in
- Calistoga
- On San Francisco permits
- Dec 2001 to Feb 2025
- Last 24 months
- 2 permits filed
144 permits since 2000: 88 completed, 3 in progress, 32 never finaled, 21 expired or cancelled.
Of the 32 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 28 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 39 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2014 | Expired or cancelled cancelled Jan 2020 | 1650 41st Av | build a deck on the roofDetails
build a deck on the roof | $13,000 |
| Aug 6, 2009 | Never finaled issued Sep 2009, no final | 2390 14th Av | according to complaint #200911421, dated 23 june 2009. repair decorative decks at front of property due to dry-rot & repair stucco needed around deck (in-kind).Details
according to complaint #200911421, dated 23 june 2009. repair decorative decks at front of property due to dry-rot & repair stucco needed around deck (in-kind). | $15,000 |
| Apr 11, 2005 | Completed final sign-off Sep 2005 | 2640 Lyon St | repair damage wood on deck,less than 50%approx ly 180 with same type of materials.2x6 redwood.Details
repair damage wood on deck,less than 50%approx ly 180 with same type of materials.2x6 redwood. | $3,500 |
| Oct 8, 2002 | Completed final sign-off Apr 2003 | 1380 16th Av | construct new 2 level wood decks at rear of houseDetails
construct new 2 level wood decks at rear of house | $15,000 |