Back to bathroom remodel contractors
City Property Restoration
- Based in
- Burlingame
- On San Francisco permits
- Jan 2000 to Jan 2002
- Last 24 months
- 0 permits filed
14 permits since 2000: 7 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 109 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2001 | Completed final sign-off Nov 2001 | 1011 23rd St | wter damage frm sprinkler replace 693 sf hdwd flr 12 sf cer tile 3rdfl bath 4th fl maple tread/risrDetails
wter damage frm sprinkler replace 693 sf hdwd flr 12 sf cer tile 3rdfl bath 4th fl maple tread/risr | $43,000 |
| Jul 18, 2000 | Expired or cancelled expired Jan 2001 | 486 32nd Av | water damage repairs in bathroom, replace membrane, floor, shower, ceramic tiles, clean-upDetails
water damage repairs in bathroom, replace membrane, floor, shower, ceramic tiles, clean-up | $24,900 |