Chung's Construction Co
- Based in
- Alameda
- On San Francisco permits
- Sep 2009 to Sep 2009
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 190 days from filing to permit and 506 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2009 | Completed final sign-off Aug 2011 | 72 Andover St | provide new foundation & slab on grade, repair/repl (e) framing & siding with wood rot if any, on l1, l2, l3. convert big bathroom to 2 small bathrooms. extend dormer & roof on l3. re-work/repl (e) plubming & electrical, heating as required. no change to front & rear setbacks.Details
provide new foundation & slab on grade, repair/repl (e) framing & siding with wood rot if any, on l1, l2, l3. convert big bathroom to 2 small bathrooms. extend dormer & roof on l3. re-work/repl (e) plubming & electrical, heating as required. no change to front & rear setbacks. | $150,000 |