Chui's Construction
- Based in
- San Ramon
- On San Francisco permits
- Apr 2009 to Mar 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 7 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2025 | Completed final sign-off Mar 2026 | 1320 Portola Dr | bathroom: replace shower, toilet, sink, new tile, dry wall & plumbing & electrical neededDetails
bathroom: replace shower, toilet, sink, new tile, dry wall & plumbing & electrical needed | $14,000 |
| Apr 21, 2009 | Completed final sign-off May 2009 | 439 Mangels Av | replace all fixtures in existing bath with new.Details
replace all fixtures in existing bath with new. | $9,500 |