Back to bathroom remodel contractors
Chuck Voutselas Plumbing Llc
- Based in
- Novato
- On San Francisco permits
- Nov 2002 to Aug 2024
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 23, 2018 | Completed final sign-off Aug 2018 | 1 Daniel Burnham Ct | unit 206. remove tile around (e) bath tub, install hardy backer w/ new tile. install new p.b valve at (e) tub. maher n/aDetails
unit 206. remove tile around (e) bath tub, install hardy backer w/ new tile. install new p.b valve at (e) tub. maher n/a | $3,000 |
| Oct 31, 2016 | Completed final sign-off Jan 2017 | 2299 Sacramento St | bathroom: remove bathrtub: install new piping, new bathrum, tile surround & tile floor.Details
bathroom: remove bathrtub: install new piping, new bathrum, tile surround & tile floor. | $10,000 |
| Sep 13, 2016 | Completed final sign-off Jan 2017 | 445 Francisco St | no walls moved,removed and added, all existing layouts to remain. remove bath tub & install shower stall, remove vanity and install new cabinet, master bathroom; maher n/aDetails
no walls moved,removed and added, all existing layouts to remain. remove bath tub & install shower stall, remove vanity and install new cabinet, master bathroom; maher n/a | $6,000 |
| Mar 4, 2014 | Completed final sign-off Nov 2014 | 1 Daniel Burnham Ct | work in unit 707 ,remove & replace tile around 1 tub, & 2 showers and floors. new sinks & toilets (3 bathrooms) to existingDetails
work in unit 707 ,remove & replace tile around 1 tub, & 2 showers and floors. new sinks & toilets (3 bathrooms) to existing | $10,000 |
| Jul 23, 2012 | Completed final sign-off May 2013 | 1998 Broadway | remove & replace kitchen & 2 bathrooms, install washer & dryer.Details
remove & replace kitchen & 2 bathrooms, install washer & dryer. | $40,000 |